Optimization Approach for Yard Crane Scheduling Problem with Uncertain Parameters in Container Terminals

被引:10
|
作者
Liu, Wenqian [1 ]
Zhu, Xiaoning [1 ]
Wang, Li [1 ]
Yan, Baicheng [1 ]
Zhang, Xuewei [2 ]
机构
[1] Beijing Jiaotong Univ, Sch Traff & Transportat, Beijing 100044, Peoples R China
[2] China Commun Informat Technol Grp Co LTD, Beijing 100088, Peoples R China
关键词
ALGORITHMS; BERTH;
D O I
10.1155/2021/5537114
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
As the core operational issue in container terminals, yard crane scheduling problem directly affects the overall operation efficiency of port connecting highway or railway transportation and sea transportation. In practice, the scheduling of yard cranes is subject to many uncertain factors, so the scheme may be inapplicable and needs to be adjusted. From the perspective of proactive strategy, considering fluctuations in arrival time of external trucks as well as varied handling volume of yard cranes, a stochastic programming model is established in this paper to obtain a fixed scheme with the minimum expected value of yard crane makespan and total task waiting time over all the scenarios. The scheme does not require rescheduling when facing different situations. Subsequently, two algorithms based on certain rules are proposed to obtain the yard crane operation scheme in the deterministic environment, which are taken as the basic solution in the uncertain conditions, and then a tailored genetic algorithm is adopted to find the optimal solution with good adaptability to the uncertain scenarios. Finally, we use small-scale examples to compare the performance of algorithms in the deterministic and uncertain environment and then analyze the relationship between different yard crane configurations and the number of tasks. Large-scale experiments are performed to study the operation efficiency of the storage yard with different handling volumes assigned to each yard crane.
引用
收藏
页数:15
相关论文
共 50 条
  • [31] Yard crane scheduling problem in a container terminal considering risk caused by uncertainty
    He, Junliang
    Tan, Caimao
    Zhang, Yuting
    ADVANCED ENGINEERING INFORMATICS, 2019, 39 : 14 - 24
  • [32] Simulation-based Optimization on Quay Crane Scheduling of Container Terminals
    Li Haoyuan
    Sun Qi
    2017 29TH CHINESE CONTROL AND DECISION CONFERENCE (CCDC), 2017, : 1135 - 1139
  • [33] Tandem Lift Quay Cranes and Yard Trucks Scheduling Problem at Container Terminals
    Chen, Li Hua
    Cao, Jin Xin
    Zhao, Qing Yu
    ADVANCES IN TRANSPORTATION, PTS 1 AND 2, 2014, 505-506 : 927 - 930
  • [34] Integrated scheduling optimization of AGV and double yard cranes in automated container terminals
    Zhang, Xiaoju
    Li, Huijuan
    Sheu, Jiuh-Biing
    TRANSPORTATION RESEARCH PART B-METHODOLOGICAL, 2024, 179
  • [35] A flexible crane scheduling methodology for container terminals
    Dik, Guvenc
    Kozan, Erhan
    FLEXIBLE SERVICES AND MANUFACTURING JOURNAL, 2017, 29 (01) : 64 - 96
  • [36] A flexible crane scheduling methodology for container terminals
    Guvenc Dik
    Erhan Kozan
    Flexible Services and Manufacturing Journal, 2017, 29 : 64 - 96
  • [37] A crane scheduling method for port container terminals
    Kim, KH
    Park, YM
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2004, 156 (03) : 752 - 768
  • [38] A Method of Quay Crane Scheduling For Container Terminals
    Ning Zhao
    Mi Weijian
    Xue Bao
    NATURAL RESOURCES AND SUSTAINABLE DEVELOPMENT II, PTS 1-4, 2012, 524-527 : 824 - 827
  • [39] A Quay Crane Scheduling Model in Container Terminals
    Tang, Qi
    ADVANCES IN SWARM INTELLIGENCE, PT 2, PROCEEDINGS, 2010, 6146 : 283 - 290
  • [40] Yard Crane Scheduling for container storage, retrieval, and relocation
    Galle, Virgile
    Barnhart, Cynthia
    Jaillet, Patrick
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2018, 271 (01) : 288 - 316