Optimization Approach for Yard Crane Scheduling Problem with Uncertain Parameters in Container Terminals

被引:10
|
作者
Liu, Wenqian [1 ]
Zhu, Xiaoning [1 ]
Wang, Li [1 ]
Yan, Baicheng [1 ]
Zhang, Xuewei [2 ]
机构
[1] Beijing Jiaotong Univ, Sch Traff & Transportat, Beijing 100044, Peoples R China
[2] China Commun Informat Technol Grp Co LTD, Beijing 100088, Peoples R China
关键词
ALGORITHMS; BERTH;
D O I
10.1155/2021/5537114
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
As the core operational issue in container terminals, yard crane scheduling problem directly affects the overall operation efficiency of port connecting highway or railway transportation and sea transportation. In practice, the scheduling of yard cranes is subject to many uncertain factors, so the scheme may be inapplicable and needs to be adjusted. From the perspective of proactive strategy, considering fluctuations in arrival time of external trucks as well as varied handling volume of yard cranes, a stochastic programming model is established in this paper to obtain a fixed scheme with the minimum expected value of yard crane makespan and total task waiting time over all the scenarios. The scheme does not require rescheduling when facing different situations. Subsequently, two algorithms based on certain rules are proposed to obtain the yard crane operation scheme in the deterministic environment, which are taken as the basic solution in the uncertain conditions, and then a tailored genetic algorithm is adopted to find the optimal solution with good adaptability to the uncertain scenarios. Finally, we use small-scale examples to compare the performance of algorithms in the deterministic and uncertain environment and then analyze the relationship between different yard crane configurations and the number of tasks. Large-scale experiments are performed to study the operation efficiency of the storage yard with different handling volumes assigned to each yard crane.
引用
收藏
页数:15
相关论文
共 50 条
  • [21] A comprehensive review of quay crane scheduling, yard operations and integrations thereof in container terminals
    Kizilay, Damla
    Eliiyi, Deniz Tursel
    FLEXIBLE SERVICES AND MANUFACTURING JOURNAL, 2021, 33 (01) : 1 - 42
  • [22] Optimization model and algorithm for quay crane scheduling in container terminals
    Qin, J. (qinjin@csu.edu.cn), 1600, Science Press (48):
  • [23] Yard crane scheduling to minimize total weighted vessel loading time in container terminals
    Shell Ying Huang
    Ya Li
    Flexible Services and Manufacturing Journal, 2017, 29 : 689 - 720
  • [24] Yard crane scheduling to minimize total weighted vessel loading time in container terminals
    Huang, Shell Ying
    Li, Ya
    FLEXIBLE SERVICES AND MANUFACTURING JOURNAL, 2017, 29 (3-4) : 689 - 720
  • [25] Integrated optimization on yard crane scheduling and vehicle positioning at container yards
    Zhou, Chenhao
    Lee, Byung Kwon
    Li, Haobin
    TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, 2020, 138
  • [26] Performing A* Search for Yard Crane Dispatching in Container Terminals
    Guo, Xi
    Huang, Shell Ying
    20TH IEEE INTERNATIONAL CONFERENCE ON TOOLS WITH ARTIFICIAL INTELLIGENCE, VOL 1, PROCEEDINGS, 2008, : 263 - 267
  • [27] Integrated Yard Space Allocation and Yard Crane Deployment Problem in Resource-Limited Container Terminals
    Tan, Caimao
    He, Junliang
    SCIENTIFIC PROGRAMMING, 2016, 2016
  • [28] Quay crane scheduling in container terminals
    Ng, W. C.
    Mak, K. L.
    ENGINEERING OPTIMIZATION, 2006, 38 (06) : 723 - 737
  • [29] Scheduling optimization of yard cranes with minimal energy consumption at container terminals
    Sha, Mei
    Zhang, Tao
    Lan, Ying
    Zhou, Xin
    Qin, Tianbao
    Yu, Dayong
    Chen, Kai
    COMPUTERS & INDUSTRIAL ENGINEERING, 2017, 113 : 704 - 713
  • [30] The Joint quay crane scheduling and block allocation problem in container terminals
    Hu, Hongtao
    Chen, Xiazhong
    Zhen, Lu
    Ma, Chengle
    Zhang, Xiaotian
    IMA JOURNAL OF MANAGEMENT MATHEMATICS, 2019, 30 (01) : 51 - 75