Integrated Yard Space Allocation and Yard Crane Deployment Problem in Resource-Limited Container Terminals

被引:7
|
作者
Tan, Caimao [1 ]
He, Junliang [2 ]
机构
[1] Shanghai Maritime Univ, Sci Res Acad, 1550 Haigang Ave, Shanghai 201306, Peoples R China
[2] Shanghai Maritime Univ, Engn Res Ctr Container Supply Chain Technol, Minist Educ, Shanghai 201306, Peoples R China
基金
中国国家自然科学基金;
关键词
OPERATIONS-RESEARCH; STORAGE STRATEGY; TRANSSHIPMENT;
D O I
10.1155/2016/6421943
中图分类号
TP31 [计算机软件];
学科分类号
081202 ; 0835 ;
摘要
Yard storage space and yard crane equipment are the core resources in the container terminal yard area. This paper studies the integrated yard space allocation (outbound container space) and yard crane deployment problem in resource-limited container terminals where yard space and yard cranes are extremely scarce. Two corresponding counterstrategies are introduced, respectively, and the integrated problem is solved as mixed integer programming. The model this paper formulated considers the container volume fluctuation of the service line, and the objective is a trade-off between yard sharing space and terminal operation cost. In numerical experiments, this paper tries to reveal the management meaning in practical operation of container terminal and provides decision support for terminal managers; therefore a series of scenarios are presented to analyze the relations among the yard sharing space, the number of yard cranes, the size of yard subblock, and the cost of terminal operation.
引用
收藏
页数:12
相关论文
共 50 条
  • [1] YARD CRANE DEPLOYMENT IN CONTAINER TERMINALS
    Huang, Shell Ying
    Li, Ya
    Lau, Meimei
    Tay, Teck Chin
    [J]. PROCEEDINGS OF THE 2014 WINTER SIMULATION CONFERENCE (WSC), 2014, : 1735 - 1746
  • [2] Integrated Quay Crane and Yard Truck Schedule Problem in Container Terminals
    曹瑾鑫
    史其信
    Der-Horng Lee
    [J]. Tsinghua Science and Technology, 2010, 15 (04) : 467 - 474
  • [3] Yard crane scheduling in port container terminals
    Ng, WC
    Mak, KL
    [J]. APPLIED MATHEMATICAL MODELLING, 2005, 29 (03) : 263 - 276
  • [4] Berth and quay crane allocation and scheduling with worker performance variability and yard truck deployment in container terminals
    Chargui, Kaoutar
    Zouadi, Tarik
    El Fallahi, Abdellah
    Reghioui, Mohamed
    Aouam, Tarik
    [J]. TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, 2021, 154
  • [5] A branch-and-price method for integrated yard crane deployment and container allocation in transshipment yards
    Jiang, Xin Jia
    Jin, Jian Gang
    [J]. TRANSPORTATION RESEARCH PART B-METHODOLOGICAL, 2017, 98 : 62 - 75
  • [6] Joint optimization of space allocation and yard crane deployment in container terminal under uncertain demand
    Yang, Xurui
    Hu, Hongtao
    Jin, Jiangang
    Luo, Nan
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2022, 172
  • [7] Solving the Twin Yard Crane Scheduling Problem in Automated Container Terminals
    Oladugba, A. O.
    Gheith, M.
    Eltawil, A.
    [J]. 2019 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2019, : 1398 - 1402
  • [8] An accelerated Benders decomposition algorithm for the integrated storage space assignment, berth allocation, and yard crane deployment problem
    Soroushnia, Golsa
    Alinaghian, Mahdi
    Malekahmadi, Amirsalar
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2024, 194
  • [9] Performing A* Search for Yard Crane Dispatching in Container Terminals
    Guo, Xi
    Huang, Shell Ying
    [J]. 20TH IEEE INTERNATIONAL CONFERENCE ON TOOLS WITH ARTIFICIAL INTELLIGENCE, VOL 1, PROCEEDINGS, 2008, : 263 - 267
  • [10] Robust Multistage Yard Crane Scheduling in Container Terminals
    Marx, Tobias
    Hartisch, Michael
    [J]. OPERATIONS RESEARCH PROCEEDINGS 2021, 2022, : 268 - 273