A quay crane scheduling algorithm considering the workload of yard cranes in a container yard

被引:21
|
作者
Wang, Yan [1 ]
Kim, Kap Hwan [1 ]
机构
[1] Pusan Natl Univ, Dept Ind Engn, Pusan 609735, South Korea
关键词
Quay cranes; Scheduling; Container terminals; Congestion; TERMINALS; BRANCH;
D O I
10.1007/s10845-009-0303-9
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
Quay cranes (QCs) are the most important equipment for vessel operation in container terminals. It is important to efficiently schedule the operations of QCs so that a high productivity may be achieved in terminals. Because the storage yard is shared by multiple vessels, where the congestion of yard cranes and yard trucks must be considered, the operations of QCs for multiple vessels must be simultaneously considered for QC scheduling. The objective terms include the QC make-span, the total traveling distance of QCs, the expected delay time from interference, and the uniformity of workload among blocks. This study suggests a heuristic algorithm based on a meta-heuristic search algorithm. Finally, a numerical experiment is carried out to test the performance of the algorithm.
引用
收藏
页码:459 / 470
页数:12
相关论文
共 50 条
  • [1] A quay crane scheduling algorithm considering the workload of yard cranes in a container yard
    Yan Wang
    Kap Hwan Kim
    Journal of Intelligent Manufacturing, 2011, 22 : 459 - 470
  • [2] A quay crane scheduling method considering interference of yard cranes in container terminals
    Jung, Da Hun
    Park, Young-Man
    Lee, Byung Kwon
    Kim, Kap Hwan
    Ryu, Kwang Ryel
    MICAI 2006: ADVANCES IN ARTIFICIAL INTELLIGENCE, PROCEEDINGS, 2006, 4293 : 461 - +
  • [3] Scheduling Yard Cranes Considering Crane Interference
    Speer, Ulf
    John, Gerlinde
    Fischer, Kathrin
    COMPUTATIONAL LOGISTICS, 2011, 6971 : 321 - +
  • [4] Quay Cranes and Yard Trucks Scheduling Problem at Container Terminals
    Behjat, S.
    Nahavandi, N.
    INTERNATIONAL JOURNAL OF ENGINEERING, 2020, 33 (09): : 1751 - 1758
  • [5] Integrated internal truck, yard crane and quay crane scheduling in a container terminal considering energy consumption
    He, Junliang
    Huan, Youfang
    Yan, Wei
    Wang, Shuaian
    EXPERT SYSTEMS WITH APPLICATIONS, 2015, 42 (05) : 2464 - 2487
  • [6] Scheduling quay cranes and yard trucks for unloading operations in container ports
    Zhen, Lu
    Yu, Shucheng
    Wang, Shuaian
    Sun, Zhuo
    ANNALS OF OPERATIONS RESEARCH, 2019, 273 (1-2) : 455 - 478
  • [7] Simultaneous Load Scheduling of Quay Crane and Yard Crane in Port Container Terminals
    Lee, Der-Horng
    Cao, Zhi
    Chen, Jiang Hang
    Cao, Jin Xin
    TRANSPORTATION RESEARCH RECORD, 2009, (2097) : 62 - 69
  • [8] Scheduling quay cranes and yard trucks for unloading operations in container ports
    Lu Zhen
    Shucheng Yu
    Shuaian Wang
    Zhuo Sun
    Annals of Operations Research, 2019, 273 : 455 - 478
  • [9] Optimal Scheduling Model of Yard Cranes in Container Yard
    Guo, Jianquan
    Kun, Fan
    PROCEEDINGS OF THE NINTH INTERNATIONAL CONFERENCE ON INFORMATION AND MANAGEMENT SCIENCES, 2010, 9 : 371 - 375
  • [10] Tandem Lift Quay Cranes and Yard Trucks Scheduling Problem at Container Terminals
    Chen, Li Hua
    Cao, Jin Xin
    Zhao, Qing Yu
    ADVANCES IN TRANSPORTATION, PTS 1 AND 2, 2014, 505-506 : 927 - 930