Improvement and comparison of likelihood functions for model calibration and parameter uncertainty analysis within a Markov chain Monte Carlo scheme

被引:36
|
作者
Cheng, Qin-Bo [1 ]
Chen, Xi [2 ]
Xu, Chong-Yu [3 ,4 ]
Reinhardt-Imjela, Christian [1 ]
Schulte, Achim [1 ]
机构
[1] Free Univ Berlin, Inst Geog Sci, D-12249 Berlin, Germany
[2] Hohai Univ, State Key Lab Hydrol Water Resources & Hydraul En, Nanjing 210098, Jiangsu, Peoples R China
[3] Univ Oslo, Dept Geosci, N-0316 Oslo, Norway
[4] Uppsala Univ, Dept Earth Sci, Uppsala, Sweden
基金
中国国家自然科学基金; 对外科技合作项目(国际科技项目);
关键词
Bayesian inference; Box-Cox transformation; Nash-Sutcliffe Efficiency coefficient; Generalized Error Distribution; SWAT-WB-VSA; BAYESIAN METHOD; DATA ASSIMILATION; GLUE; SOIL; AUTOCORRELATION; IMPLEMENTATION; INFERENCE; JOINT;
D O I
10.1016/j.jhydrol.2014.10.008
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
In this study, the likelihood functions for uncertainty analysis of hydrological models are compared and improved through the following steps: (1) the equivalent relationship between the Nash-Sutcliffe Efficiency coefficient (NSE) and the likelihood function with Gaussian independent and identically distributed residuals is proved; (2) a new estimation method of the Box-Cox transformation (BC) parameter is developed to improve the effective elimination of the heteroscedasticity of model residuals; and (3) three likelihood functions-NSE, Generalized Error Distribution with BC (BC-GED) and Skew Generalized Error Distribution with BC (BC-SGED)-are applied for SWAT-WB-VSA (Soil and Water Assessment Tool - Water Balance - Variable Source Area) model calibration in the Baocun watershed, Eastern China. Performances of calibrated models are compared using the observed river discharges and groundwater levels. The result shows that the minimum variance constraint can effectively estimate the BC parameter. The form of the likelihood function significantly impacts on the calibrated parameters and the simulated results of high and low flow components. SWAT-WB-VSA with the NSE approach simulates flood well, but baseflow badly owing to the assumption of Gaussian error distribution, where the probability of the large error is low, but the small error around zero approximates equiprobability. By contrast, SWAT-WB-VSA with the BC-GED or BC-SGED approach mimics baseflow well, which is proved in the groundwater level simulation. The assumption of skewness of the error distribution may be unnecessary, because all the results of the BC-SGED approach are nearly the same as those of the BC-GED approach. (C) 2014 Elsevier B.V. All rights reserved.
引用
收藏
页码:2202 / 2214
页数:13
相关论文
共 50 条
  • [11] Using Markov Chain Monte Carlo to quantify parameter uncertainty and its effect on predictions of a groundwater flow model
    Hassan, Ahmed E.
    Bekhit, Hesham M.
    Chapman, Jenny B.
    ENVIRONMENTAL MODELLING & SOFTWARE, 2009, 24 (06) : 749 - 763
  • [12] BAYESIAN CALIBRATION OF A CERVICAL CANCER MODEL USING MARKOV CHAIN MONTE CARLO
    Walsh, C.
    Ortendahl, J.
    Sy, S.
    Kim, J.
    VALUE IN HEALTH, 2011, 14 (07) : A470 - A470
  • [13] Characterising geotechnical model uncertainty by hybrid Markov Chain Monte Carlo simulation
    Zhang, J.
    Tang, Wilson H.
    Zhang, L. M.
    Huang, H. W.
    COMPUTERS AND GEOTECHNICS, 2012, 43 : 26 - 36
  • [14] Recovery of Graded Response Model Parameters: A Comparison of Marginal Maximum Likelihood and Markov Chain Monte Carlo Estimation
    Kieftenbeld, Vincent
    Natesan, Prathiba
    APPLIED PSYCHOLOGICAL MEASUREMENT, 2012, 36 (05) : 399 - 419
  • [15] The analysis of Key Comparison Reference Value and its uncertainty using Markov Chain Monte Carlo method
    Zhang, Haiyun
    Xu, Dinghua
    Liu, Jianli
    Zhao, Tiepeng
    TENTH INTERNATIONAL SYMPOSIUM ON PRECISION ENGINEERING MEASUREMENTS AND INSTRUMENTATION, 2019, 11053
  • [16] Assessment of parameter uncertainty in hydrological model using a Markov-Chain-Monte-Carlo-based multilevel-factorial-analysis method
    Zhang, Junlong
    Li, Yongping
    Huang, Guohe
    Chen, Xi
    Bao, Anming
    JOURNAL OF HYDROLOGY, 2016, 538 : 471 - 486
  • [17] Generalized Likelihood Uncertainty Estimation and Markov Chain Monte Carlo Simulation to Prioritize TMDL Pollutant Allocations
    Mishra, Anurag
    Ahmadisharaf, Ebrahim
    Benham, Brian L.
    Wolfe, Mary Leigh
    Leman, Scotland C.
    Gallagher, Daniel L.
    Reckhow, Kenneth H.
    Smith, Eric P.
    JOURNAL OF HYDROLOGIC ENGINEERING, 2018, 23 (12)
  • [18] Maximum likelihood parameter estimation of multiple chirp signals by a new Markov chain Monte Carlo approach
    Lin, Y
    Peng, YN
    Wang, XT
    PROCEEDINGS OF THE IEEE 2004 RADAR CONFERENCE, 2004, : 559 - 562
  • [19] Application of the ecosystem model and Markov Chain Monte Carlo for parameter estimation and productivity prediction
    Li, Weizhong
    Peng, Changhui
    Zhou, Xiaolu
    Sun, Jianfeng
    Zhu, Qiuan
    Wu, Haibin
    St-Onge, Benoit
    ECOSPHERE, 2015, 6 (12):
  • [20] Markov chain Monte Carlo approach to parameter estimation in the FitzHugh-Nagumo model
    Jensen, Anders Chr.
    Ditlevsen, Susanne
    Kessler, Mathieu
    Papaspiliopoulos, Omiros
    PHYSICAL REVIEW E, 2012, 86 (04):