A weighted assembly precedence graph for assembly sequence planning

被引:32
|
作者
Wang, Yong [1 ]
Tian, De [1 ]
机构
[1] North China Elect Power Univ, Renewable Energy Sch, Beijing 102206, Peoples R China
关键词
Assembly sequence planning; Weighted assembly precedence graph; Fuzzy analytical hierarchy process; Minimum spanning tree-based algorithm; HIERARCHICAL APPROACH; ALGORITHM; OPTIMIZATION; GENERATION; INTEGRATION; DESIGN;
D O I
10.1007/s00170-015-7565-5
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Assembly sequence planning is one of the well-known combinatorial optimization problems in manufacturing. An assembly is often represented as an assembly relation graph or precedence graph. The traditional methods are used to generate a large number of feasible assembly sequences and then find the optimal sequence through evaluation. A lot of computation resources are needed. To reduce the complexity of assembly sequence planning, the assembly is converted into a weighted assembly precedence graph considering multiple assembly constraints, i.e., the qualitative and quantitative constraints. The vertices in the weighted precedence graph are the parts or components. The qualitative constraints including the topological and geometrical assembly constraints guarantee to derive the feasible assembly sequences. Some process constraints are also taken as the qualitative constraints. They are represented as the directed edges in the weighted assembly precedence graph. The other assembly constraints, such as the stable support, connector strength, changes of assembly directions, and tools and so forth, are quantified as indices to compute the cost of assembly relations with the fuzzy analytical hierarchy process. The costs are taken as the heuristic information to find the optimal or near-optimal assembly sequences. With the weighted assembly precedence graph, the search space of the optimal assembly sequence will be reduced. We design a minimum spanning tree-based algorithm to detect the optimal assembly sequence based on the weighted assembly precedence graph. The optimal assembly sequences are found in O(n (3)) computation time, where n is the number of the discrete parts.
引用
收藏
页码:99 / 115
页数:17
相关论文
共 50 条
  • [21] Analysis of the complexity of precedence graphs for assembly and task planning
    Ramos, C
    Rocha, J
    Vale, Z
    1997 IEEE INTERNATIONAL SYMPOSIUM ON ASSEMBLY AND TASK PLANNING (ISATP'97) - TOWARDS FLEXIBLE AND AGILE ASSEMBLY AND MANUFACTURING, 1997, : 19 - 24
  • [22] PRECEDENCE KNOWLEDGE IN FEATURE MATING OPERATION ASSEMBLY PLANNING
    HUANG, YF
    LEE, CSG
    PROCEEDINGS - 1989 IEEE INTERNATIONAL CONFERENCE ON ROBOTICS AND AUTOMATION, VOL 1-3, 1989, : 216 - 221
  • [23] Assembly sequence planning for motion planning
    Wan, Weiwei
    Harada, Kensuke
    Nagata, Kazuyuki
    ASSEMBLY AUTOMATION, 2018, 38 (02) : 195 - 206
  • [24] Minimal precedence constraints for integrated assembly and execution planning
    Rajan, VN
    Nof, SY
    IEEE TRANSACTIONS ON ROBOTICS AND AUTOMATION, 1996, 12 (02): : 175 - 186
  • [25] A hierarchical approach to generating precedence graphs for assembly planning
    Niu, XW
    Ding, H
    Xiong, YL
    INTERNATIONAL JOURNAL OF MACHINE TOOLS & MANUFACTURE, 2003, 43 (14): : 1473 - 1486
  • [26] Flexible Assembly through Integrated Assembly Sequence Planning and Grasp Planning
    Thomas, Ulrike
    Stouraitis, Theodoros
    Roa, Maximo A.
    2015 INTERNATIONAL CONFERENCE ON AUTOMATION SCIENCE AND ENGINEERING (CASE), 2015, : 586 - 592
  • [27] Precedence Constraint Knowledge-based Assembly Sequence Planning for Open-Architecture Products
    Ma, Hongqin
    Peng, Qingjin
    Zhang, Jian
    Gu, Peihua
    9TH INTERNATIONAL CONFERENCE ON DIGITAL ENTERPRISE TECHNOLOGY - INTELLIGENT MANUFACTURING IN THE KNOWLEDGE ECONOMY ERA, 2016, 56 : 7 - 12
  • [28] Assembly features and sequence planning
    vanHolland, W
    Bronsvoort, WF
    PRODUCT MODELING FOR COMPUTER INTEGRATED DESIGN AND MANUFACTURE, 1997, : 275 - 284
  • [29] Assembly Sequence Planning: A Review
    Zhang H.-Y.
    Recent Advances in Computer Science and Communications, 2022, 15 (04) : 531 - 539
  • [30] Efficient and Feasible Robotic Assembly Sequence Planning via Graph Representation Learning
    Atad, Matan
    Feng, Jianxiang
    Rodriguez, Ismael
    Durner, Maximilian
    Triebel, Rudolph
    2023 IEEE/RSJ INTERNATIONAL CONFERENCE ON INTELLIGENT ROBOTS AND SYSTEMS (IROS), 2023, : 8262 - 8269