A weighted assembly precedence graph for assembly sequence planning

被引:32
|
作者
Wang, Yong [1 ]
Tian, De [1 ]
机构
[1] North China Elect Power Univ, Renewable Energy Sch, Beijing 102206, Peoples R China
关键词
Assembly sequence planning; Weighted assembly precedence graph; Fuzzy analytical hierarchy process; Minimum spanning tree-based algorithm; HIERARCHICAL APPROACH; ALGORITHM; OPTIMIZATION; GENERATION; INTEGRATION; DESIGN;
D O I
10.1007/s00170-015-7565-5
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Assembly sequence planning is one of the well-known combinatorial optimization problems in manufacturing. An assembly is often represented as an assembly relation graph or precedence graph. The traditional methods are used to generate a large number of feasible assembly sequences and then find the optimal sequence through evaluation. A lot of computation resources are needed. To reduce the complexity of assembly sequence planning, the assembly is converted into a weighted assembly precedence graph considering multiple assembly constraints, i.e., the qualitative and quantitative constraints. The vertices in the weighted precedence graph are the parts or components. The qualitative constraints including the topological and geometrical assembly constraints guarantee to derive the feasible assembly sequences. Some process constraints are also taken as the qualitative constraints. They are represented as the directed edges in the weighted assembly precedence graph. The other assembly constraints, such as the stable support, connector strength, changes of assembly directions, and tools and so forth, are quantified as indices to compute the cost of assembly relations with the fuzzy analytical hierarchy process. The costs are taken as the heuristic information to find the optimal or near-optimal assembly sequences. With the weighted assembly precedence graph, the search space of the optimal assembly sequence will be reduced. We design a minimum spanning tree-based algorithm to detect the optimal assembly sequence based on the weighted assembly precedence graph. The optimal assembly sequences are found in O(n (3)) computation time, where n is the number of the discrete parts.
引用
收藏
页码:99 / 115
页数:17
相关论文
共 50 条
  • [11] Assembly sequence planning for automated micro assembly
    Udeshi, T
    Tsui, K
    ISATP 2005: IEEE International Symposium on Assembly and Task Planning (ISATP), 2005, : 98 - 105
  • [12] Assembly stability as a constraint for assembly sequence planning
    Mosemann, H
    Rohrdanz, F
    Wahl, F
    1998 IEEE INTERNATIONAL CONFERENCE ON ROBOTICS AND AUTOMATION, VOLS 1-4, 1998, : 233 - 238
  • [13] ASSEMBLY SEQUENCE PLANNING WITH THE PRINCIPLES OF DESIGN FOR ASSEMBLY
    Sasiadek, Michal
    DS 80-4 PROCEEDINGS OF THE 20TH INTERNATIONAL CONFERENCE ON ENGINEERING DESIGN (ICED 15) VOL 4: DESIGN FOR X, DESIGN TO X, 2015,
  • [14] A Novel Assembly Sequence Design Mechanism for Assembly Sequence Planning
    Zhang, Nan
    Liu, Zhenyu
    Qiu, Chan
    Tan, Jianrong
    2021 THE 8TH INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND APPLICATIONS-EUROPE, ICIEA 2021-EUROPE, 2021, : 109 - 114
  • [15] Optimal robotic assembly sequence planning using stability graph through stable assembly subset identification
    Murali, G. Bala
    Deepak, B. B. V. L.
    Raju, M. V. A.
    Biswal, B. B.
    PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART C-JOURNAL OF MECHANICAL ENGINEERING SCIENCE, 2019, 233 (15) : 5410 - 5430
  • [16] Automatic assembly sequence exploration without precedence definition
    Viganò R.
    Osorio Gómez G.
    International Journal on Interactive Design and Manufacturing, 2013, 7 (02) : 79 - 89
  • [17] Graph-based assembly sequence planning algorithm with feedback weights
    Zhu, Xiaojun
    Xu, Zhigang
    Wang, Junyi
    Yang, Xiao
    Fan, Linlin
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2023, 125 (7-8): : 3607 - 3617
  • [18] A Graph-based framework for assembly sequence planning of a cable harness
    Zhou, Hang
    Lu, Qi
    Qian, Jinwu
    JOURNAL OF MANUFACTURING SYSTEMS, 2024, 73 : 39 - 51
  • [19] Graph-based assembly sequence planning algorithm with feedback weights
    Xiaojun Zhu
    Zhigang Xu
    Junyi Wang
    Xiao Yang
    Linlin Fan
    The International Journal of Advanced Manufacturing Technology, 2023, 125 : 3607 - 3617
  • [20] Assembly sequence planning of automobile body components based on liaison graph
    Xing, Y.
    Chen, G.
    Lai, X.
    Jin, S.
    Zhou, J.
    ASSEMBLY AUTOMATION, 2007, 27 (02) : 157 - 164