共 50 条
- [2] Integrated approach to generation of precedence relations and precedence graphs for assembly sequence planning [J]. Chinese Journal of Mechanical Engineering (English Edition), 2002, 15 (03): : 193 - 198
- [4] Analysis of the complexity of precedence graphs for assembly and task planning [J]. 1997 IEEE INTERNATIONAL SYMPOSIUM ON ASSEMBLY AND TASK PLANNING (ISATP'97) - TOWARDS FLEXIBLE AND AGILE ASSEMBLY AND MANUFACTURING, 1997, : 19 - 24
- [5] Assembly sequences, assembly constraints, precedence graphs [J]. PROCEEDINGS OF THE 2003 IEEE INTERNATIONAL SYMPOSIUM ON ASSEMBLY AND TASK PLANNING (ISATP2003), 2003, : 90 - 95
- [6] A hierarchical approach to assembly sequence planning [J]. ICMA 2002 INTERNATIONAL CONFERENCE ON MANUFACTURING AUTOMATION, 2002, : 321 - 328
- [8] A weighted assembly precedence graph for assembly sequence planning [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2016, 83 (1-4): : 99 - 115
- [9] A weighted assembly precedence graph for assembly sequence planning [J]. The International Journal of Advanced Manufacturing Technology, 2016, 83 : 99 - 115
- [10] PRECEDENCE KNOWLEDGE ACQUISITION FOR GENERATING ROBOT ASSEMBLY SEQUENCES [J]. 1989 IEEE INTERNATIONAL CONFERENCE ON SYSTEMS, MAN, AND CYBERNETICS, VOLS 1-3: CONFERENCE PROCEEDINGS, 1989, : 71 - 76