Fuzzy approach to prequalifying construction contractors

被引:40
|
作者
Li, Yawei [1 ]
Nie, Xiangtian
Chen, Shouyu
机构
[1] Minist Water Resources, Bur Comprehens Dev, Beijing 100053, Peoples R China
[2] N China Inst Water Conservancy & Hydroelect Power, Zhengzhou 450008, Peoples R China
[3] Dalian Univ Technol, Sch Civil & Hydraul Engn, Dalian 116024, Peoples R China
关键词
fuzzy sets; construction management; contractors; decision making;
D O I
10.1061/(ASCE)0733-9364(2007)133:1(40)
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Construction contractor prequalification (CCPQ) is a crucial decision making process to select capable potential bidders and ensure the success of construction projects. The purpose of CCPQ is to guarantee a contractor's characteristic to meet the construction project's requirements, which has been established worldwide as a standard practice. However, existing methods, i.e., marking method, subjective judgment method, etc., for contractor prequalification have been inadequate because it is difficult for decision makers to investigate contractor's capabilities against inexact, vagueness, and qualitative criteria. The objective of this paper is to propose a fuzzy framework-based fuzzy number theory to solve construction contractor prequalification issues, which include decision criteria analysis, weights assessment, and decision model development. Finally, a case study for a tunnel construction project was used to demonstrate the feasibility of fuzzy approaches.
引用
收藏
页码:40 / 49
页数:10
相关论文
共 50 条
  • [1] Applying evidential reasoning to prequalifying construction contractors
    Sönmez, M
    Holt, GD
    Yang, JB
    Graham, G
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2002, 18 (03) : 111 - 119
  • [2] A fuzzy approach for assessing contractors' competitiveness
    Tan, Yongtao
    Shen, Li-Yin
    Langston, Craig
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2011, 18 (03) : 234 - +
  • [3] The Selection of Construction Sub-contractors using the Fuzzy Sets Theory
    Krzeminski, Michal
    PROCEEDINGS OF THE INTERNATIONAL CONFERENCE OF NUMERICAL ANALYSIS AND APPLIED MATHEMATICS 2014 (ICNAAM-2014), 2015, 1648
  • [4] Prequalification of Egyptian construction contractors using fuzzy-AHP models
    Hosny, Ossama
    Nassar, Khaled
    Esmail, Yasser
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2013, 20 (04) : 381 - +
  • [5] Application of Fuzzy Logic on Selection of Contractors for Construction of High Rise Buildings
    Beljkas, Z.
    Prascevic, Z.
    Ivanisevic, N.
    Knezevic, M.
    Cvetkovska, M.
    INTERNATIONAL SCIENTIFIC CONFERENCE PEOPLE, BUILDINGS AND ENVIRONMENT 2018 (PBE), 2019, 222
  • [6] Using fuzzy neural network approach to estimate contractors' markup
    Liu, M
    Ling, YY
    BUILDING AND ENVIRONMENT, 2003, 38 (11) : 1303 - 1308
  • [7] Multicriteria selection of construction contractors. Neural network approach
    Bendano-Jacome, Ricardo
    del Cano-Gochi, Alfredo
    de la Cruz-Lopez, Pilar
    Castro-Rascado, Alberto
    DYNA, 2010, 85 (01): : 71 - 84
  • [8] Project portfolio selection for construction contractors by MCDM–GIS approach
    A. Hashemizadeh
    Y. Ju
    International Journal of Environmental Science and Technology, 2019, 16 : 8283 - 8296
  • [9] MINORITY CONSTRUCTION CONTRACTORS
    OZANNE, DL
    HARVARD CIVIL RIGHTS-CIVIL LIBERTIES LAW REVIEW, 1977, 12 (03) : 693 - 724
  • [10] A fuzzy-based decision support system for construction contractors evaluation and selection
    Otegbeye, Mojisola
    Cheickna, Sylla
    FIFTH WUHAN INTERNATIONAL CONFERENCE ON E-BUSINESS, VOLS 1-3: INTEGRATION AND INNOVATION THROUGH MEASUREMENT AND MANAGEMENT, 2006, : 2165 - 2172