Application of Fuzzy Logic on Selection of Contractors for Construction of High Rise Buildings

被引:0
|
作者
Beljkas, Z. [1 ]
Prascevic, Z. [2 ]
Ivanisevic, N. [2 ]
Knezevic, M. [1 ]
Cvetkovska, M. [3 ]
机构
[1] Univ Montenegro, Fac Civil Engn Podgorica, Podgorica, Montenegro
[2] Univ Belgrade, Fac Civil Engn, Belgrade, Serbia
[3] Ss Cyril & Methodius Univ Skopje, Fac Civil Engn, Skopje, North Macedonia
关键词
D O I
10.1088/1755-1315/222/1/012021
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Selection process of a construction contractor is highly important and successful implementation of a project and realization of sustainability are largely dependent on it. Computer programs - expert systems - may be used to help the employer or his consultants in the process of best tenderer selection. This paper presents a new expert system based on the implementation of fuzzy logic as an aid in selecting a contractor for construction of high rise buildings.
引用
收藏
页数:13
相关论文
共 50 条
  • [1] Application of Modular Construction in High-Rise Buildings
    Lawson, R. Mark
    Ogden, Ray G.
    Bergin, Rory
    JOURNAL OF ARCHITECTURAL ENGINEERING, 2012, 18 (02)
  • [2] APPLICATION OF BIM DURING LEAN CONSTRUCTION OF HIGH-RISE BUILDINGS
    Yang, Suchun
    CIVIL ENGINEERING JOURNAL-STAVEBNI OBZOR, 2019, 28 (03): : 331 - 343
  • [3] The Selection of Construction Sub-contractors using the Fuzzy Sets Theory
    Krzeminski, Michal
    PROCEEDINGS OF THE INTERNATIONAL CONFERENCE OF NUMERICAL ANALYSIS AND APPLIED MATHEMATICS 2014 (ICNAAM-2014), 2015, 1648
  • [4] Fuzzy-logic control with application to intelligent buildings
    Thint, MP
    Wong, FS
    Dong, WM
    CIVIL ENGINEERING SYSTEMS, 1996, 14 (01): : 19 - 54
  • [5] Artificial Intelligence in Buildings: A Review of the Application of Fuzzy Logic
    Kolokotsa, D.
    ADVANCES IN BUILDING ENERGY RESEARCH, 2007, 1 (01) : 29 - 54
  • [6] Active TMD systematic design of fuzzy control and the application in high-rise buildings
    Chen, Z. Y.
    Jiang, Rong
    Wang, Ruei-Yuan
    Chen, Timothy
    EARTHQUAKES AND STRUCTURES, 2021, 21 (06) : 577 - 585
  • [7] The selection procedure of the projects construction, based on fuzzy logic
    Blaga, Florin
    Prada, Marcela
    Bungau, Constantin
    Stanasel, Iulian
    PROCEEDINGS OF THE 2ND REVIEW OF MANAGEMENT AND ECONOMIC ENGINEERING MANAGEMENT CONFERENCE: MANAGEMENT OF CRISIS OR CRISIS OF MANAGEMENT?, 2011, : 27 - 35
  • [8] Application of fuzzy logic to simulation for construction operations
    Zhang, H
    Tam, CM
    Shi, JJS
    JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2003, 17 (01) : 38 - 45
  • [9] A fuzzy-based decision support system for construction contractors evaluation and selection
    Otegbeye, Mojisola
    Cheickna, Sylla
    FIFTH WUHAN INTERNATIONAL CONFERENCE ON E-BUSINESS, VOLS 1-3: INTEGRATION AND INNOVATION THROUGH MEASUREMENT AND MANAGEMENT, 2006, : 2165 - 2172
  • [10] Application of Fuzzy Logic in Selection of Remanufacturing Technology
    Kafuku, John Mbogo
    Saman, Muhamad Zameri Mat
    Yusof, Sha'ri Mohd
    SUSTAINABLE MANUFACTURING FOR GLOBAL CIRCULAR ECONOMY, 2019, 33 : 192 - 199