Fuzzy approach to prequalifying construction contractors

被引:40
|
作者
Li, Yawei [1 ]
Nie, Xiangtian
Chen, Shouyu
机构
[1] Minist Water Resources, Bur Comprehens Dev, Beijing 100053, Peoples R China
[2] N China Inst Water Conservancy & Hydroelect Power, Zhengzhou 450008, Peoples R China
[3] Dalian Univ Technol, Sch Civil & Hydraul Engn, Dalian 116024, Peoples R China
关键词
fuzzy sets; construction management; contractors; decision making;
D O I
10.1061/(ASCE)0733-9364(2007)133:1(40)
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Construction contractor prequalification (CCPQ) is a crucial decision making process to select capable potential bidders and ensure the success of construction projects. The purpose of CCPQ is to guarantee a contractor's characteristic to meet the construction project's requirements, which has been established worldwide as a standard practice. However, existing methods, i.e., marking method, subjective judgment method, etc., for contractor prequalification have been inadequate because it is difficult for decision makers to investigate contractor's capabilities against inexact, vagueness, and qualitative criteria. The objective of this paper is to propose a fuzzy framework-based fuzzy number theory to solve construction contractor prequalification issues, which include decision criteria analysis, weights assessment, and decision model development. Finally, a case study for a tunnel construction project was used to demonstrate the feasibility of fuzzy approaches.
引用
收藏
页码:40 / 49
页数:10
相关论文
共 50 条
  • [41] PEOPLE AND PROPERTY - CONTROLLING CONSTRUCTION CONTRACTORS
    HALPER, EB
    REAL ESTATE REVIEW, 1980, 10 (01): : 74 - 80
  • [42] Factors effecting construction contractors' performance
    Assaf, SA
    AlHammad, AM
    Ubaid, A
    BUILDING RESEARCH AND INFORMATION, 1996, 24 (03): : 159 - 163
  • [43] Learning mechanisms employed by construction contractors
    Kululanga, G.K.
    McCaffer, R.
    Price, A.D.F.
    Edum-Fotwe, F.
    Journal of Construction Engineering and Management, 125 (04): : 215 - 223
  • [44] Evaluating the financial health of construction contractors
    Singh, D.
    Tiong, R. L. K.
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-MUNICIPAL ENGINEER, 2006, 159 (03) : 161 - 166
  • [45] Learning mechanisms employed by construction contractors
    Kululanga, GK
    McCaffer, R
    Price, ADF
    Edum-Fotwe, F
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1999, 125 (04): : 215 - 223
  • [46] Framework for evaluating bids of construction contractors
    King Saud Univ, Riyadh, Saudi Arabia
    J Manage Eng, 2 (72-78):
  • [47] Measuring and Evaluating Safety Maturity of Construction Contractors: Multicriteria Decision-Making Approach
    Karakhan, Ali A.
    Rajendran, Sathyanarayanan
    Gambatese, John
    Nnaji, Chukwuma
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2018, 144 (07)
  • [48] PRE-QUALIFYING CONSTRUCTION CONTRACTORS
    LOWER, JR
    JOURNAL AMERICAN WATER WORKS ASSOCIATION, 1982, 74 (05): : 220 - 223
  • [49] CONTRACTORS CONSTRUCTION-CLAIMS AVOIDANCE
    JERGEAS, GF
    HARTMAN, FT
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1994, 120 (03): : 553 - 560
  • [50] HOSPITAL CONSTRUCTION - ARRANGEMENTS WITH ARCHITECTS AND CONTRACTORS
    GOSHEN, CE
    MENTAL HOSPITALS, 1959, 10 (03): : 29 - 31