A fuzzy approach for assessing contractors' competitiveness

被引:11
|
作者
Tan, Yongtao [1 ]
Shen, Li-Yin [1 ]
Langston, Craig [2 ]
机构
[1] Hong Kong Polytech Univ, Dept Bldg & Real Estate, Kowloon, Hong Kong, Peoples R China
[2] Bond Univ, Fac Business Technol & Sustainable Dev, Gold Coast, Australia
关键词
Fuzzy control; Competitive strategy; Construction industry; Linguistics; Hong Kong;
D O I
10.1108/09699981111126151
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Purpose - Proper assessment of contractors' competitiveness is important for assisting contractors in taking internal analysis and for assisting clients in selecting suitable contractors. This paper seeks to address this issue. Design/methodology/approach - With previously identified contractor key competitiveness indicators (KCIs), this study presents a fuzzy competitiveness rating (FCR) method for measuring contractor competitiveness with reference to the Hong Kong construction industry. A set of linguistic terms is used for facilitating the assessment process. Findings - For illustration, an example is used to show the application of the FCR method. The results provide valuable information for helping contractors in the local construction industry to understand their competitive advantages and weaknesses, and to formulate effective competition strategies to improve their competitiveness. Research limitations/implications - The model used in this study is not validated by real cases. In a future paper, the model will be further demonstrated by conducting real case studies, and the linguistic terms and corresponding fuzzy numbers will also be re-defined based on the collected data. Originality/value - As the competitiveness assessment process involves complexity and uncertainty, a fuzzy competitiveness rating method is considered suitable for reflecting the reality and the assessment panel can easily give their opinions by using the linguistic language.
引用
收藏
页码:234 / +
页数:15
相关论文
共 50 条
  • [1] A computer-aided decision support system for assessing contractors' competitiveness
    Zhao, Hui
    Wang, Xueqing
    Yu, Gang
    [J]. 2008 PROCEEDINGS OF INFORMATION TECHNOLOGY AND ENVIRONMENTAL SYSTEM SCIENCES: ITESS 2008, VOL 2, 2008, : 226 - 230
  • [2] Fuzzy approach to prequalifying construction contractors
    Li, Yawei
    Nie, Xiangtian
    Chen, Shouyu
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2007, 133 (01) : 40 - 49
  • [3] A fuzzy analytic hierarchy process approach for assessing national competitiveness in the hydrogen technology sector
    Lee, Seong Kon
    Mogi, Gento
    Kim, Jong Wook
    Gim, Bong Jin
    [J]. INTERNATIONAL JOURNAL OF HYDROGEN ENERGY, 2008, 33 (23) : 6840 - 6848
  • [4] Assessing Istanbul competitiveness: a multidimensional approach
    Minghetti, Valeria
    Montaguti, Federica
    [J]. INTERNATIONAL JOURNAL OF CULTURE TOURISM AND HOSPITALITY RESEARCH, 2010, 4 (03) : 228 - 240
  • [5] Competitiveness of inexperienced and experienced contractors in bidding
    Fu, WK
    Drew, DS
    Lo, HP
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2003, 129 (04): : 388 - 395
  • [6] Network strategy for contractors’ business competitiveness
    Keung, Calvin
    Shen, Liyin
    [J]. Construction Management and Economics, 2017, 35 (8-9) : 482 - 497
  • [7] A system dynamics approach for assessing SMEs' competitiveness
    Lafuente, Esteban
    Szerb, Laszlo
    Rideg, Andras
    [J]. JOURNAL OF SMALL BUSINESS AND ENTERPRISE DEVELOPMENT, 2020, 27 (04) : 555 - 578
  • [8] Assessing the camping competitiveness using a clustering approach
    Grande, Kevin
    Botti, Laurent
    Camprubi, Raquel
    [J]. JOURNAL OF OUTDOOR RECREATION AND TOURISM-RESEARCH PLANNING AND MANAGEMENT, 2023, 42
  • [9] An analytical approach to assessing the competitiveness in the textile industry
    Shafaei, Rasoul
    [J]. JOURNAL OF FASHION MARKETING AND MANAGEMENT, 2009, 13 (01) : 20 - +
  • [10] A fuzzy approach to assess the contractor's competitiveness
    Dong, Na
    Zhang, Jing
    Yu, Min-jiu
    [J]. FRONTIERS OF GREEN BUILDING, MATERIALS AND CIVIL ENGINEERING, PTS 1-8, 2011, 71-78 : 3946 - 3949