In-pile testing of ITER first wall mock-ups at relevant thermal loading conditions

被引:4
|
作者
Litunovsky, N. [1 ]
Gervash, A. [1 ]
Lorenzetto, P. [2 ]
Mazul, I. [1 ]
Melder, R. [3 ]
机构
[1] DV Efremov Sci Res Inst Electrophys Apparatus, St Petersburg, Russia
[2] EFDA, Barcelona, Spain
[3] Res Inst Atom Reactors, Dimitrovgrad, Russia
关键词
5;
D O I
10.1016/j.jnucmat.2008.12.268
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The paper describes the experimental technique and preliminary results of thermal fatigue testing of ITER first wall (FW) water-cooled mock-ups inside the core of the RBT-6 experimental fission reactor (RIAR, Dimitrovgrad, Russia). This experiment has provided simultaneous effect of neutron fluence and thermal cycling damages on the mock-ups. A PC-controlled high-temperature graphite ohmic heater was applied to provide cyclic thermal load onto the mock-ups surface. This experiment lasted for 309 effective irradiation days with a final damage level (CuCrZr) of 1 dpa in the mock-ups. About 3700 thermal cycles with a heat flux of 0.4-0.5 MW/m(2) onto the mock-ups were realized before the heater fails. Then, irradiation was continued in a non-cycling mode. (C) 2009 Elsevier B.V. All rights reserved.
引用
收藏
页码:979 / 982
页数:4
相关论文
共 50 条
  • [1] Design for in-pile thermal fatigue of first wall mock-ups under ITER relevant conditions
    Schmalz, F.
    Blom, F. J.
    Kamer, S.
    Ketema, D. J.
    FUSION ENGINEERING AND DESIGN, 2007, 82 (15-24) : 1820 - 1824
  • [2] In-pile testing of ITER first wall mock-ups at relevant thermal loading conditions in the LVR-15 nuclear research reactor
    Kysela, Jan
    Entler, Slavomir
    Vsolak, Rudolf
    Klabik, Tomas
    Zlamal, Ondrej
    Bellin, Boris
    Zacchia, Francesco
    FUSION ENGINEERING AND DESIGN, 2015, 98-99 : 1271 - 1275
  • [3] Thermal-mechanical test on ITER primary first wall mock-ups
    Dell'Orco, G
    Lorenzetto, P
    Malavasi, A
    Polazzi, G
    Simoncini, M
    Venturi, G
    Zito, D
    FUSION ENGINEERING AND DESIGN, 2002, 61-62 : 117 - 122
  • [4] Fabrication of Be/CuCrZr/SS mock-ups for ITER first wall
    Park, Jeong-Yong
    Choi, Byung-Kwon
    Lee, Jung-Suk
    Lee, Dong Won
    Hong, Bong Guen
    Jeong, Yong Hwan
    FUSION ENGINEERING AND DESIGN, 2009, 84 (7-11) : 1468 - 1471
  • [5] Experimental and numerical assessment of normal heat flux first wall qualification mock-ups under ITER relevant conditions
    Du, J.
    Buerger, A.
    Pintsuk, G.
    Linke, J.
    Loewenhoff, Th
    Bellin, B.
    Zacchia, F.
    Eaton, R.
    Mitteau, R.
    Raffray, R.
    PHYSICA SCRIPTA, 2014, T159
  • [6] Progress on fatigue characterization of ITER primary first wall mock-ups
    Dell'Orco, G
    Lorenzetto, P
    Alessandrini, I
    Bernardi, G
    Malavasi, A
    Sansone, L
    Venturi, G
    FUSION ENGINEERING AND DESIGN, 2003, 66-68 : 311 - 316
  • [7] Fabrication and high heat flux testing of plasma sprayed beryllium ITER first wall mock-ups
    Castro, RG
    Elliot, KE
    Watson, RD
    Youchison, DL
    Slattery, KT
    JOURNAL OF NUCLEAR MATERIALS, 1998, 258 : 252 - 257
  • [8] Heat load test of Be/Cu joint for ITER first wall mock-ups
    Uchida, M
    Ishitsuka, E
    Hatano, T
    Barabash, V
    Kawamura, H
    JOURNAL OF NUCLEAR MATERIALS, 2002, 307 : 1533 - 1536
  • [9] Fabrication and high heat flux testing of plasma sprayed beryllium ITER first wall mock-ups
    Castro, R.G.
    Elliot, K.E.
    Watson, R.D.
    Youchison, D.L.
    Slattery, K.T.
    Journal of Nuclear Materials, 1998, 258-263 (pt A): : 252 - 257
  • [10] Engineering and manufacturing of ITER first mirror mock-ups
    Joanny, M.
    Travere, J. M.
    Salasca, S.
    Corre, Y.
    Marot, L.
    Thellier, C.
    Gallay, G.
    Cammarata, C.
    Passier, B.
    Ferme, J. J.
    REVIEW OF SCIENTIFIC INSTRUMENTS, 2010, 81 (10):