Progress on fatigue characterization of ITER primary first wall mock-ups

被引:4
|
作者
Dell'Orco, G
Lorenzetto, P
Alessandrini, I
Bernardi, G
Malavasi, A
Sansone, L
Venturi, G
机构
[1] ENEA Brasimone, I-40035 Camugnano, Bo, Italy
[2] EFDA, D-85748 Garching, Germany
[3] ENEA Bologna, Bologna, Italy
关键词
fatigue; ITER; primary first wall;
D O I
10.1016/S0920-3796(03)00180-7
中图分类号
TL [原子能技术]; O571 [原子核物理学];
学科分类号
0827 ; 082701 ;
摘要
In 2001, EFDA has assigned to ENEA a contract for the thermomechanical testing of six mock-ups of the ITER primary wall module. These small scale mock-ups, reproducing representative portions of the reference ITER primary wall panels, were fabricated during ITER EDA phase by solid hot isostatic pressing (HIPping) of an AISI 316L stainless steel back structure to a alumina dispersion strengthened (DS)-Cu alloy heat sink armored with beryllium tiles. The experimental program, carried-out at ENEA Brasimone CEF 1-2 thermal hydraulic facility, was focused on the thermal mechanical testing of these mock-ups aiming at verifying which tile geometry and manufacturing procedure assures the required reliability of the beryllium/DS-Cu alloy/SS joints at high incident heat flux ( > 0.8 MW/m(2)) both at steady state and under thermal fatigue tests. The paper presents the progress in the experimental activity of the first test campaign and the main thermomechanical FEM analyses after the detachment and rupture of Beryllium tiles from one mock-up. (C) 2003 Elsevier B.V. All rights reserved.
引用
收藏
页码:311 / 316
页数:6
相关论文
共 50 条
  • [1] Thermal-mechanical test on ITER primary first wall mock-ups
    Dell'Orco, G
    Lorenzetto, P
    Malavasi, A
    Polazzi, G
    Simoncini, M
    Venturi, G
    Zito, D
    [J]. FUSION ENGINEERING AND DESIGN, 2002, 61-62 : 117 - 122
  • [2] Fabrication of Be/CuCrZr/SS mock-ups for ITER first wall
    Park, Jeong-Yong
    Choi, Byung-Kwon
    Lee, Jung-Suk
    Lee, Dong Won
    Hong, Bong Guen
    Jeong, Yong Hwan
    [J]. FUSION ENGINEERING AND DESIGN, 2009, 84 (7-11) : 1468 - 1471
  • [3] Design for in-pile thermal fatigue of first wall mock-ups under ITER relevant conditions
    Schmalz, F.
    Blom, F. J.
    Kamer, S.
    Ketema, D. J.
    [J]. FUSION ENGINEERING AND DESIGN, 2007, 82 (15-24) : 1820 - 1824
  • [4] Heat load test of Be/Cu joint for ITER first wall mock-ups
    Uchida, M
    Ishitsuka, E
    Hatano, T
    Barabash, V
    Kawamura, H
    [J]. JOURNAL OF NUCLEAR MATERIALS, 2002, 307 : 1533 - 1536
  • [5] Engineering and manufacturing of ITER first mirror mock-ups
    Joanny, M.
    Travere, J. M.
    Salasca, S.
    Corre, Y.
    Marot, L.
    Thellier, C.
    Gallay, G.
    Cammarata, C.
    Passier, B.
    Ferme, J. J.
    [J]. REVIEW OF SCIENTIFIC INSTRUMENTS, 2010, 81 (10):
  • [6] Achievements on Engineering and Manufacturing of ITER First Mirrors mock-ups
    Joanny, M.
    Travere, J. M.
    Salasca, S.
    Marot, L.
    Meyer, E.
    Thellier, C.
    Cammarata, C.
    Gallay, G.
    Ferme, J. J.
    [J]. 2011 IEEE/NPSS 24TH SYMPOSIUM ON FUSION ENGINEERING (SOFE), 2011,
  • [7] Thermal fatigue tests with actively cooled divertor mock-ups for ITER
    Rodig, M
    Duwe, R
    Ibbott, C
    Jacobson, D
    Le Marois, G
    Lind, A
    Linke, J
    Lorenzetto, P
    Peacock, A
    Plochl, L
    Schuster, A
    Severi, Y
    Vieider, G
    Visca, E
    Wiechers, B
    [J]. FUSION ENGINEERING AND DESIGN, 1998, 39-40 : 551 - 557
  • [8] High Heat Flux Test with HIP Bonded Be/Cu Mock-ups for the ITER First Wall
    Lee, Dong Won
    Bae, Young Dug
    Kim, Suk Kwon
    Hong, Bong Guen
    Jung, Hyun Kyu
    Park, Jeong Yong
    Jeong, Yong Hwan
    Choi, Byung Kwon
    [J]. 2009 23RD IEEE/NPSS SYMPOSIUM ON FUSION ENGINEERING, 2009, : 365 - 368
  • [9] In-pile testing of ITER first wall mock-ups at relevant thermal loading conditions
    Litunovsky, N.
    Gervash, A.
    Lorenzetto, P.
    Mazul, I.
    Melder, R.
    [J]. JOURNAL OF NUCLEAR MATERIALS, 2009, 386-88 : 979 - 982
  • [10] Manufacture and first wall joining for an ITER primary wall module prototype: R&D phase with small scale mock-ups
    Bobin-Vastra, I
    Febvre, M
    Lorenzetto, P
    Bouveret, Y
    Cauvin, D
    Raisson, G
    Conchon, D
    [J]. FUSION ENGINEERING AND DESIGN, 2001, 56-57 : 261 - 266