Manufacture and first wall joining for an ITER primary wall module prototype: R&D phase with small scale mock-ups

被引:0
|
作者
Bobin-Vastra, I
Febvre, M
Lorenzetto, P
Bouveret, Y
Cauvin, D
Raisson, G
Conchon, D
机构
[1] FRAMATOME Ctr Tech, Dept Soudage, Stn Haut Flux Therm FE200, F-71205 Le Creusot, France
[2] FRAMATOME Ctr Tech, NDT Dept, F-71380 St Marcel, France
[3] EFDA Close Support Unit, D-85748 Garching, Germany
[4] TECPHY, F-58160 Imphy, France
[5] ATMOSTAT, F-94815 Villejuif, France
关键词
primary wall module; R&D phase; ITER;
D O I
10.1016/S0920-3796(01)00297-6
中图分类号
TL [原子能技术]; O571 [原子核物理学];
学科分类号
0827 ; 082701 ;
摘要
In the frame of the Primary Wall Module prototype manufacturing for ITER, a consistent R&D phase was conducted in order to identify the industrial allowable tolerances and manufacturing problems which would occur when joining pieces by HIPping process during the PW module manufacturing. The purpose of this development was to give as industrial as possible manufacturing routes for joining together large Stainless Steel or DS-Copper pieces with Stainless Steel tubes and for bonding Beryllium tiles onto a curved component surface. The study concerned surface preparations, allowable gaps and joint geometry, Beryllium tile geometry, Titanium interlayer thickness, ... This R&D phase also allowed the development and validation of different ultrasonic inspection tools needed for plate-plate, tube-plate, edge to edge plate bonding. (C) 2001 Elsevier Science BN. All rights reserved.
引用
收藏
页码:261 / 266
页数:6
相关论文
共 29 条
  • [1] Manufacture and first wall joining for an ITER primary wall module prototype: results of a medium scale mock-up manufacturing
    Febvre, M
    Bobin-Vastra, I
    Lorenzetto, P
    Bouveret, Y
    Cauvin, D
    Raisson, G
    Conchon, D
    [J]. FUSION ENGINEERING AND DESIGN, 2001, 56-57 : 267 - 271
  • [2] Progress on fatigue characterization of ITER primary first wall mock-ups
    Dell'Orco, G
    Lorenzetto, P
    Alessandrini, I
    Bernardi, G
    Malavasi, A
    Sansone, L
    Venturi, G
    [J]. FUSION ENGINEERING AND DESIGN, 2003, 66-68 : 311 - 316
  • [3] Manufacturing of small-scale mock-ups and of a semi-prototype the ITER Normal Heat Flux First Wall
    Banetta, S.
    Zacchia, F.
    Lorenzetto, P.
    Bobin-Vastra, I.
    Boireau, B.
    Cottin, A.
    Mitteau, R.
    Eaton, R.
    Raffray, R.
    [J]. FUSION ENGINEERING AND DESIGN, 2014, 89 (7-8) : 970 - 974
  • [4] ITER baffle module small-scale mock-ups: First Wall thermo-mechanical testing results
    Severi, Y
    Chappuis, P
    Giancarli, L
    Le Marois, G
    Poitevin, Y
    Rodig, M
    Salavy, JF
    Vieider, G
    [J]. FUSION ENGINEERING AND DESIGN, 1998, 39-40 : 559 - 567
  • [5] ITER baffle module small-scale mock-ups: First Wall thermo-mechanical testing results
    CEA-Cadarache, St. Paul-lez-Durance, France
    [J]. Fusion Eng Des, Pt A (559-567):
  • [6] Thermal-mechanical test on ITER primary first wall mock-ups
    Dell'Orco, G
    Lorenzetto, P
    Malavasi, A
    Polazzi, G
    Simoncini, M
    Venturi, G
    Zito, D
    [J]. FUSION ENGINEERING AND DESIGN, 2002, 61-62 : 117 - 122
  • [7] Fabrication of Be/CuCrZr/SS mock-ups for ITER first wall
    Park, Jeong-Yong
    Choi, Byung-Kwon
    Lee, Jung-Suk
    Lee, Dong Won
    Hong, Bong Guen
    Jeong, Yong Hwan
    [J]. FUSION ENGINEERING AND DESIGN, 2009, 84 (7-11) : 1468 - 1471
  • [8] Heat load test of Be/Cu joint for ITER first wall mock-ups
    Uchida, M
    Ishitsuka, E
    Hatano, T
    Barabash, V
    Kawamura, H
    [J]. JOURNAL OF NUCLEAR MATERIALS, 2002, 307 : 1533 - 1536
  • [9] High heat flux components with beryllium armour: From the small-scale mock-ups to the full-scale prototype of the ITER first wall panel
    Piskarev, P. Yu.
    Gervash, A. A.
    Glazunov, D. A.
    Okuneva, E. V.
    Mazul, I. V.
    Krasilnikov, A. V.
    Putrik, A. B.
    Kuznetsov, V. E.
    Rulev, R. V.
    Ruzanov, V. V.
    Ogursky, A. Yu.
    Bobrov, S. V.
    Lapin, A. V.
    Gurieva, T. M.
    Lyanzberg, D. V.
    Panteleev, M. A.
    Sokolov, I. V.
    Makhankov, N. A.
    Vasiliev, V. A.
    Levichev, V. V.
    [J]. FUSION ENGINEERING AND DESIGN, 2024, 203
  • [10] Manufacture of an ITER primary wall module shield prototype by powder hipping
    Lorenzetto, P
    Daenner, W
    Lind, A
    Eriksson, H
    Hjorth, CG
    Lill, K
    Cardella, A
    [J]. FUSION ENGINEERING AND DESIGN, 2001, 58-59 : 561 - 566