Thermal-mechanical test on ITER primary first wall mock-ups

被引:11
|
作者
Dell'Orco, G
Lorenzetto, P
Malavasi, A
Polazzi, G
Simoncini, M
Venturi, G
Zito, D
机构
[1] ENEA Brasimone, I-40035 Camugnano, Bo, Italy
[2] EFDA, D-85748 Garching, Germany
[3] ENEA, Bologna, Italy
[4] Dipartimento Ingn Nucl, I-90128 Palermo, Italy
关键词
D O I
10.1016/S0920-3796(02)00156-4
中图分类号
TL [原子能技术]; O571 [原子核物理学];
学科分类号
0827 ; 082701 ;
摘要
In 1998, in the frame of the ITER EDA phase, an European R&D Programme for the Blanket Design was implemented for developing and selecting the materials and the relevant fabrication procedures for manufacturing the shielding modules of the ITER Primary Wall. The fabrication of several Beryllium armored small scale mock-ups, reproducing representative portions of a Primary Wall panels, Was also launched (Fusion Technol. (1998) 195). Further experimental activities were also programmed for investigating the thermal-mechanical behavior of these mock-ups, at high heat flux and under thermal fatigue tests. In 2001, the ITER European Home Team decided to assign to ENEA a contract for the thermal fatigue testing of six mock-ups aiming at verifying the reliability of the Beryllium/Dispersion Strengthened Copper alloy/Stainless Steel and Beryllium/Precipitation hardened Copper alloy/Stainless Steel joints manufactured by solid Hot Isostatic Pressing (HIP) procedure (Technical Specification for the Thermal Fatigue Tests of Be protected EDA Mock-ups). The paper presents the results of the FEM thermal-mechanical analyses performed by ANSYS code and the progress of the first test campaign. (C) 2002 Elsevier Science B.V. All rights reserved.
引用
收藏
页码:117 / 122
页数:6
相关论文
共 50 条
  • [1] Progress on fatigue characterization of ITER primary first wall mock-ups
    Dell'Orco, G
    Lorenzetto, P
    Alessandrini, I
    Bernardi, G
    Malavasi, A
    Sansone, L
    Venturi, G
    [J]. FUSION ENGINEERING AND DESIGN, 2003, 66-68 : 311 - 316
  • [2] Heat load test of Be/Cu joint for ITER first wall mock-ups
    Uchida, M
    Ishitsuka, E
    Hatano, T
    Barabash, V
    Kawamura, H
    [J]. JOURNAL OF NUCLEAR MATERIALS, 2002, 307 : 1533 - 1536
  • [3] Fabrication of Be/CuCrZr/SS mock-ups for ITER first wall
    Park, Jeong-Yong
    Choi, Byung-Kwon
    Lee, Jung-Suk
    Lee, Dong Won
    Hong, Bong Guen
    Jeong, Yong Hwan
    [J]. FUSION ENGINEERING AND DESIGN, 2009, 84 (7-11) : 1468 - 1471
  • [4] High Heat Flux Test with HIP Bonded Be/Cu Mock-ups for the ITER First Wall
    Lee, Dong Won
    Bae, Young Dug
    Kim, Suk Kwon
    Hong, Bong Guen
    Jung, Hyun Kyu
    Park, Jeong Yong
    Jeong, Yong Hwan
    Choi, Byung Kwon
    [J]. 2009 23RD IEEE/NPSS SYMPOSIUM ON FUSION ENGINEERING, 2009, : 365 - 368
  • [5] In-pile testing of ITER first wall mock-ups at relevant thermal loading conditions
    Litunovsky, N.
    Gervash, A.
    Lorenzetto, P.
    Mazul, I.
    Melder, R.
    [J]. JOURNAL OF NUCLEAR MATERIALS, 2009, 386-88 : 979 - 982
  • [6] High heat flux test with HIP bonded Be/Cu/SS mock-ups for the ITER first wall
    Lee, Dong Won
    Bae, Young Dug
    Kim, Suk Kwon
    Hong, Bong Guen
    Jung, Hyun Kyu
    Park, Jeong Yong
    Jeong, Yong Hwan
    Choi, Byung Kwon
    [J]. FUSION ENGINEERING AND DESIGN, 2009, 84 (7-11) : 1160 - 1163
  • [7] Design for in-pile thermal fatigue of first wall mock-ups under ITER relevant conditions
    Schmalz, F.
    Blom, F. J.
    Kamer, S.
    Ketema, D. J.
    [J]. FUSION ENGINEERING AND DESIGN, 2007, 82 (15-24) : 1820 - 1824
  • [8] Engineering and manufacturing of ITER first mirror mock-ups
    Joanny, M.
    Travere, J. M.
    Salasca, S.
    Corre, Y.
    Marot, L.
    Thellier, C.
    Gallay, G.
    Cammarata, C.
    Passier, B.
    Ferme, J. J.
    [J]. REVIEW OF SCIENTIFIC INSTRUMENTS, 2010, 81 (10):
  • [9] High heat flux test with HIP-bonded Cu/SS mock-ups for the ITER first wall
    Lee, Dong Won
    Bae, Young Dug
    Kim, Suk Kwon
    Hong, Bong Guen
    Lee, Jong Hyuk
    Park, Jeong Yong
    Jeong, Yong Hwan
    Choi, Byung Kwon
    [J]. FUSION ENGINEERING AND DESIGN, 2008, 83 (7-9) : 1038 - 1043
  • [10] Achievements on Engineering and Manufacturing of ITER First Mirrors mock-ups
    Joanny, M.
    Travere, J. M.
    Salasca, S.
    Marot, L.
    Meyer, E.
    Thellier, C.
    Cammarata, C.
    Gallay, G.
    Ferme, J. J.
    [J]. 2011 IEEE/NPSS 24TH SYMPOSIUM ON FUSION ENGINEERING (SOFE), 2011,