In-pile testing of ITER first wall mock-ups at relevant thermal loading conditions

被引:4
|
作者
Litunovsky, N. [1 ]
Gervash, A. [1 ]
Lorenzetto, P. [2 ]
Mazul, I. [1 ]
Melder, R. [3 ]
机构
[1] DV Efremov Sci Res Inst Electrophys Apparatus, St Petersburg, Russia
[2] EFDA, Barcelona, Spain
[3] Res Inst Atom Reactors, Dimitrovgrad, Russia
关键词
5;
D O I
10.1016/j.jnucmat.2008.12.268
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The paper describes the experimental technique and preliminary results of thermal fatigue testing of ITER first wall (FW) water-cooled mock-ups inside the core of the RBT-6 experimental fission reactor (RIAR, Dimitrovgrad, Russia). This experiment has provided simultaneous effect of neutron fluence and thermal cycling damages on the mock-ups. A PC-controlled high-temperature graphite ohmic heater was applied to provide cyclic thermal load onto the mock-ups surface. This experiment lasted for 309 effective irradiation days with a final damage level (CuCrZr) of 1 dpa in the mock-ups. About 3700 thermal cycles with a heat flux of 0.4-0.5 MW/m(2) onto the mock-ups were realized before the heater fails. Then, irradiation was continued in a non-cycling mode. (C) 2009 Elsevier B.V. All rights reserved.
引用
收藏
页码:979 / 982
页数:4
相关论文
共 50 条
  • [41] High heat flux testing of ITER ICH&CD antenna beryllium faraday screen bars mock-ups
    Courtois, X.
    Meunier, L.
    Kuznetsov, V.
    Beaumont, B.
    Lamalle, P.
    Conchon, D.
    Languille, P.
    FUSION ENGINEERING AND DESIGN, 2016, 109 : 371 - 376
  • [42] Thermal fatigue testing of an ITER primary wall small scale mock up
    Lorenzetto, P
    Le Marois, G
    Saint-Antonin, F
    Roedig, M
    Duwe, R
    Daenner, W
    Cardella, A
    Lodato, A
    FUSION ENGINEERING AND DESIGN, 1998, 39-40 : 521 - 528
  • [43] High heat flux components with beryllium armour: From the small-scale mock-ups to the full-scale prototype of the ITER first wall panel
    Piskarev, P. Yu.
    Gervash, A. A.
    Glazunov, D. A.
    Okuneva, E. V.
    Mazul, I. V.
    Krasilnikov, A. V.
    Putrik, A. B.
    Kuznetsov, V. E.
    Rulev, R. V.
    Ruzanov, V. V.
    Ogursky, A. Yu.
    Bobrov, S. V.
    Lapin, A. V.
    Gurieva, T. M.
    Lyanzberg, D. V.
    Panteleev, M. A.
    Sokolov, I. V.
    Makhankov, N. A.
    Vasiliev, V. A.
    Levichev, V. V.
    FUSION ENGINEERING AND DESIGN, 2024, 203
  • [44] Manufacture of first wall mock-ups with calibrated defects for fabrication control methods: Development of UT detectable defects
    Bobin, I.
    Boireau, B.
    Cottin, A.
    Burat, O.
    Lepers, F.
    Zacchia, F.
    Lorenzetto, P.
    FUSION ENGINEERING AND DESIGN, 2012, 87 (7-8) : 1425 - 1433
  • [45] Heat flux experiments on first wall mock-ups coated by plasma sprayed B4C
    Bolt, H.
    Araki, M.
    Linke, J.
    Mallener, W.
    Nakamura, K.
    Steinbrech, R.W.
    Suzuki, S.
    Journal of Nuclear Materials, 1996, 233-237 (Pt A): : 809 - 813
  • [46] Heat flux experiments on first wall mock-ups coated by plasma sprayed B4C
    Bolt, H
    Araki, M
    Linke, J
    Mallener, W
    Nakamura, K
    Steinbrech, RW
    Suzuki, S
    JOURNAL OF NUCLEAR MATERIALS, 1996, 233 : 809 - 813
  • [47] Thermal fatigue testing of a diffusion-bonded beryllium divertor mock-up under ITER-relevant conditions
    Youchison, DL
    Guiniatouline, RN
    Watson, RD
    McDonald, JM
    Walsh, DS
    Beloturov, VI
    Mazul, IV
    Zakharov, AP
    Mills, BE
    Boehme, DR
    Savenko, VI
    FUSION TECHNOLOGY, 1996, 29 (04): : 599 - 614
  • [48] Experimental Investigation of EU-DEMO Breeding Blanket First Wall Mock-Ups in Support of the Manufacturing and Material Development Programmes
    Ghidersa, Bradut-Eugen
    Abou Sena, Ali
    Rieth, Michael
    Emmerich, Thomas
    Lux, Martin
    Aktaa, Jarir
    ENERGIES, 2021, 14 (22)
  • [49] Fabrication and high heat flux test of the first wall mock-ups for the Korean He Cooled Test Blanket (KO HCML TBM)
    Lee, Dong Won
    Kim, Suk Kwon
    Bae, Young Dug
    Chang, Doo Hee
    Hong, Bong Guen
    FUSION ENGINEERING AND DESIGN, 2009, 84 (7-11) : 1164 - 1169
  • [50] ITER primary first wall mock-up fabrication and testing for Be/Cu alloy joining development
    Lorenzetto, P
    Cardella, A
    Daenner, W
    Fèbvre, M
    Ilzhoefer, A
    Richards, W
    Roedig, M
    FUSION ENGINEERING AND DESIGN, 2002, 61-62 : 643 - 648