Thermal fatigue testing of an ITER primary wall small scale mock up

被引:9
|
作者
Lorenzetto, P
Le Marois, G
Saint-Antonin, F
Roedig, M
Duwe, R
Daenner, W
Cardella, A
Lodato, A
机构
[1] Net Team, D-85748 Garching, Germany
[2] CEA, CEREM, DEM, SGM,CENG, F-38054 Grenoble, France
[3] Forschungszentrum Julich, IWE, D-52425 Julich, Germany
[4] ITER Garching JWS, D-85748 Garching, Germany
关键词
D O I
10.1016/S0920-3796(97)00164-6
中图分类号
TL [原子能技术]; O571 [原子核物理学];
学科分类号
0827 ; 082701 ;
摘要
A first primary wall small scale mock up with beryllium as the armor material was manufactured by hot isostatic pressing (HIPing) by CEA and tested at the electron beam test facility JUDITH. The mock up consisted of a 9.4 mm thick beryllium armor joint onto a 20 mm thick dispersion strengthened copper (DS-Cu) alloy plate. Type 316L Stainless Steel tubes, 10/12 mm in diameter were embedded in the DS-Cu, which was subsequently joined onto a 30 mm thick 316LN stainless steel plate. The mock up was tested under a surface heat flux of 2.5 MW m(-2) for 100 preparatory cycles and 900 cycles of 30 s heating and 30 s cooling time. At the end of the 1000 cycles, the surface and the Be/DS-Cu joint of the mock up did not show any damage due to the fatigue test. (C) 1998 Elsevier Science S.A. All rights reserved.
引用
收藏
页码:521 / 528
页数:8
相关论文
共 50 条
  • [1] ITER primary first wall mock-up fabrication and testing for Be/Cu alloy joining development
    Lorenzetto, P
    Cardella, A
    Daenner, W
    Fèbvre, M
    Ilzhoefer, A
    Richards, W
    Roedig, M
    [J]. FUSION ENGINEERING AND DESIGN, 2002, 61-62 : 643 - 648
  • [2] Fabrication and thermal cycle testing of a first wall mock-up for ITER baffle blanket module
    Japan Atomic Energy Research Inst, Ibaraki-ken, Japan
    [J]. Fusion Technol, 3 pt 2 (908-913):
  • [3] Fabrication and thermal cycle testing of a first wall mock-up for ITER baffle blanket module
    Hatano, T
    Suzuki, S
    Yokoyama, K
    Akiba, M
    Ohmori, J
    Kuroda, T
    Takatsu, H
    [J]. FUSION TECHNOLOGY, 1998, 34 (03): : 908 - 913
  • [4] Progress on fatigue characterization of ITER primary first wall mock-ups
    Dell'Orco, G
    Lorenzetto, P
    Alessandrini, I
    Bernardi, G
    Malavasi, A
    Sansone, L
    Venturi, G
    [J]. FUSION ENGINEERING AND DESIGN, 2003, 66-68 : 311 - 316
  • [5] Main achievements of the EU HT test programme of ITER primary wall small scale mock ups
    Lorenzetto, P
    Cardella, A
    Chappuis, P
    Daenner, W
    Erskine, A
    Fèbvre, M
    Hofmann, G
    Le Gallo, P
    Stamm, H
    Tähtinen, S
    [J]. FUSION ENGINEERING AND DESIGN, 2000, 49-50 : 263 - 268
  • [6] Manufacture and first wall joining for an ITER primary wall module prototype: results of a medium scale mock-up manufacturing
    Febvre, M
    Bobin-Vastra, I
    Lorenzetto, P
    Bouveret, Y
    Cauvin, D
    Raisson, G
    Conchon, D
    [J]. FUSION ENGINEERING AND DESIGN, 2001, 56-57 : 267 - 271
  • [7] Thermal-mechanical test on ITER primary first wall mock-ups
    Dell'Orco, G
    Lorenzetto, P
    Malavasi, A
    Polazzi, G
    Simoncini, M
    Venturi, G
    Zito, D
    [J]. FUSION ENGINEERING AND DESIGN, 2002, 61-62 : 117 - 122
  • [8] High heat flux testing and post-mortem observation of small-scale ITER first wall mock-up made by HIP joining
    Japan Atomic Energy Research Inst, Ibaraki-ken, Japan
    [J]. Fusion Technol, 3 pt 2 (882-886):
  • [9] High heat flux testing and post-mortem observation of small-scale ITER first wall mock-up made by HIP joining
    Kanari, M
    Hatano, T
    Sato, S
    Furuya, K
    Kuroda, T
    Enoeda, M
    Takatsu, H
    [J]. FUSION TECHNOLOGY, 1998, 34 (03): : 882 - 886
  • [10] Thermal fatigue testing of a diffusion-bonded beryllium divertor mock-up under ITER-relevant conditions
    Youchison, DL
    Guiniatouline, RN
    Watson, RD
    McDonald, JM
    Walsh, DS
    Beloturov, VI
    Mazul, IV
    Zakharov, AP
    Mills, BE
    Boehme, DR
    Savenko, VI
    [J]. FUSION TECHNOLOGY, 1996, 29 (04): : 599 - 614