Early contractor involvement: a review of pre-construction service agreements

被引:4
|
作者
Finnie, David [1 ]
Ali, Naseem Ameer [2 ]
Park, Kenneth [3 ]
机构
[1] Otago Polytech, Coll Engn Construct & Living Sci, Construct, Dunedin, New Zealand
[2] Massey Univ, Sch Built Environm, Auckland, New Zealand
[3] Aston Univ, Coll Engn & Phys Sci, Dept Civil Engn, Construct Management & Engn, Birmingham, W Midlands, England
关键词
construction management; contracting; procurement;
D O I
10.1680/jmapl.20.00038
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Early contractor involvement involves engaging contractors to work with the client's design team during the pre-construction stage before agreeing on a construction stage contract. Despite the growing use of two-stage contracting, there is a lack of research into the forms of pre-construction service agreements and their effectiveness. This study aims to evaluate the optimal contract ingredients for a pre-construction stage agreement that can be used with a range of standard-form construction contracts based on industry preferences. Four agreements are critically evaluated: those of the Joint Contracts Tribunal and NEC3 and two bespoke agreements. Key ingredients were found to include scope of services, time obligations, design obligations, key personnel, price formation, confidentiality of material and communication and co-operation. Industry preferences were obtained through semi-structured interviews with 21 construction participants across New Zealand.
引用
收藏
页码:143 / 150
页数:8
相关论文
共 50 条
  • [31] Pre-construction evaluation practices of sustainable housing projects in the UK
    Essa, Ranya
    Fortune, Chris
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2008, 15 (06) : 514 - +
  • [32] Pre-Construction Results of Giant Steerable Science Mirror for TMT
    Yang Fei
    Zhao Hongchao
    An Qichang
    Guo Peng
    Jiang Haibo
    Guo Pengfei
    Zhang Jing
    GROUND-BASED AND AIRBORNE TELESCOPES VII, 2018, 10700
  • [33] Second Severn crossing - pre-construction period and design development
    Kitchener, JN
    Mizon, DH
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-CIVIL ENGINEERING, 1997, 120 : 13 - 21
  • [34] A Review of Application Building Information Modeling (BIM) During Pre-Construction Stage: Retrospective and Future Directions
    Lau, Santi Edra Nisa
    Zakaria, Rozana
    Aminudin, Eeydzah
    Saar, Chai Chang
    Yusof, Aswadi
    Wahid, Che Muhammad Fatihi Hafifi Che
    2ND INTERNATIONAL CONFERENCE ON SUSTAINABLE DEVELOPMENT IN CIVIL, URBAN AND TRANSPORTATION ENGINEERING (CUTE 2018), 2018, 143
  • [35] Digital fabrication, BIM and early contractor involvement in design in construction projects: a comparative case study
    Ng, Ming Shan
    Graser, Konrad
    Hall, Daniel Mark
    ARCHITECTURAL ENGINEERING AND DESIGN MANAGEMENT, 2023, 19 (01) : 39 - 55
  • [36] Geometrically engineered organoid units and their assembly for pre-construction of organ structures
    Kadotani, Ayaka
    Hayase, Gen
    Yoshino, Daisuke
    APL Bioengineering, 2024, 8 (04)
  • [37] Early Contractor Involvement enables safety and success
    不详
    OIL & GAS JOURNAL, 2015, : 76 - 76
  • [38] Environmental monitoring and assessment of the water bodies of a pre-construction urban wetland
    Zuo, Shengpeng
    Wan, Kun
    Zhou, Shoubiao
    Ye, Liangtao
    Ma, Sumin
    ENVIRONMENTAL MONITORING AND ASSESSMENT, 2014, 186 (11) : 7349 - 7355
  • [39] IMPASSE™ termite barrier:: New pre-construction termite barrier technology
    Wege, PJ
    McClellan, WD
    Bywater, AF
    Hoppé, MA
    SOCIOBIOLOGY, 2003, 41 (1A): : 169 - 176
  • [40] The Alcantara roman bridge: new archaeological documentation and pre-construction evidences
    Pizzo, Antonio
    ARQUEOLOGIA DE LA ARQUITECTURA, 2016, (13):