共 3 条
- [2] Performance standards and acceptable test conditions for preventive termiticide and insecticide treatments, termite baiting systems, and physical barriers for new structures or buildings under construction (pre-construction; during construction; post-construction) [J]. FLORIDA ENTOMOLOGIST, 2021, 104 (03) : 195 - 204