共 50 条
- [24] Pre-Construction Progress of Giant Steerable Science Mirror for TMT GROUND-BASED AND AIRBORNE TELESCOPES VI, 2016, 9906
- [25] How to do well in cost management and control of the pre-construction ICPOM2008: PROCEEDINGS OF 2008 INTERNATIONAL CONFERENCE OF PRODUCTION AND OPERATION MANAGEMENT, VOLUMES 1-3, 2008, : 1515 - 1519
- [27] Delays in the Pre-Construction Phase of State Sector Building Projects ENGINEER-JOURNAL OF THE INSTITUTION OF ENGINEERS SRI LANKA, 2009, 42 (03): : 22 - 30