共 50 条
- [1] Pre-Construction of Giant Steerable Science Mirror for TMT [J]. OPTOMECHANICAL ENGINEERING 2015, 2015, 9573
- [2] Pre-Construction Results of Giant Steerable Science Mirror for TMT [J]. GROUND-BASED AND AIRBORNE TELESCOPES VII, 2018, 10700
- [3] Relay optical function and pre-construction results of a Giant Steerable Science Mirror for a thirty meter telescope [J]. OPTICS EXPRESS, 2019, 27 (10): : 13991 - 14008
- [4] Conceptual Design of Giant Steerable Science Mirror Cell Assembly for TMT [J]. 2015 INTERNATIONAL CONFERENCE ON OPTOELECTRONICS AND MICROELECTRONICS (ICOM), 2015, : 211 - 216
- [6] Understanding Biases in Pre-Construction Estimates [J]. SCIENCE OF MAKING TORQUE FROM WIND (TORQUE 2018), 2018, 1037
- [8] Pre-construction testing (not) in sectionformat [trademark] [J]. Construction Specifier, 2002, 55 (04):