Early contractor involvement: a review of pre-construction service agreements

被引:4
|
作者
Finnie, David [1 ]
Ali, Naseem Ameer [2 ]
Park, Kenneth [3 ]
机构
[1] Otago Polytech, Coll Engn Construct & Living Sci, Construct, Dunedin, New Zealand
[2] Massey Univ, Sch Built Environm, Auckland, New Zealand
[3] Aston Univ, Coll Engn & Phys Sci, Dept Civil Engn, Construct Management & Engn, Birmingham, W Midlands, England
关键词
construction management; contracting; procurement;
D O I
10.1680/jmapl.20.00038
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Early contractor involvement involves engaging contractors to work with the client's design team during the pre-construction stage before agreeing on a construction stage contract. Despite the growing use of two-stage contracting, there is a lack of research into the forms of pre-construction service agreements and their effectiveness. This study aims to evaluate the optimal contract ingredients for a pre-construction stage agreement that can be used with a range of standard-form construction contracts based on industry preferences. Four agreements are critically evaluated: those of the Joint Contracts Tribunal and NEC3 and two bespoke agreements. Key ingredients were found to include scope of services, time obligations, design obligations, key personnel, price formation, confidentiality of material and communication and co-operation. Industry preferences were obtained through semi-structured interviews with 21 construction participants across New Zealand.
引用
收藏
页码:143 / 150
页数:8
相关论文
共 50 条
  • [41] Success factors of pre-construction stages of Ghanaian public road construction project life cycle
    Barajei, Chelteau
    Appiah-Kubi, Emmanuel
    Kheni, Nongiba A.
    Yalley, Peter P. K.
    Iddrisu, Wahab
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2024, 24 (13) : 1444 - 1453
  • [42] Impact of pre-construction planning and project characteristics on performance in the US electrical construction industry
    Menches, Cindy L.
    Hanna, Awad S.
    Nordheim, Erik V.
    Russell, Jeffrey S.
    CONSTRUCTION MANAGEMENT AND ECONOMICS, 2008, 26 (08) : 855 - 869
  • [43] Integration of Occupational Safety and Health during Pre-construction Stage in Malaysia
    Saifullah, Napsiah Mohamad
    Ismail, Faridah
    AICE-BS 2011 FAMAGUSTA (ASIA PACIFIC INTERNATIONAL CONFERENCE ON ENVIRONMENT-BEHAVIOUR STUDIES), 2012, 35 : 603 - 610
  • [44] A project control process in pre-construction phases Focus on effective methodology
    Al-Reshaid, Khaled
    Kartam, Nabil
    Tewari, Narendra
    Al-Bader, Haya
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2005, 12 (04) : 351 - +
  • [45] Pre-construction evaluation modeling of open area test sites (OATS)
    Archambeault, B
    IEEE 1997 INTERNATIONAL SYMPOSIUM ON ELECTROMAGNETIC COMPATIBILITY - SYMPOSIUM RECORD, 1997, : 462 - 467
  • [46] Environmental monitoring and assessment of the water bodies of a pre-construction urban wetland
    Shengpeng Zuo
    Kun Wan
    Shoubiao Zhou
    Liangtao Ye
    Sumin Ma
    Environmental Monitoring and Assessment, 2014, 186 : 7349 - 7355
  • [47] An automated safety risk recognition mechanism for underground construction at the pre-construction stage based on BIM
    Li, Meng
    Yu, Hongliang
    Liu, Ping
    AUTOMATION IN CONSTRUCTION, 2018, 91 : 284 - 292
  • [48] Two Steps for Self-Organized Social Network Pre-Construction
    Chang, Wei-Lun
    2011 IEEE INTERNATIONAL CONFERENCE ON SYSTEMS, MAN, AND CYBERNETICS (SMC), 2011, : 616 - 620
  • [49] BIM-TOOL DEVELOPMENT ENHANCING COLLABORATIVE SCHEDULING FOR PRE-CONSTRUCTION
    Tallgren, Mikael Viklund
    Roupe, Mattias
    Johansson, Mikael
    Bosch-Sijtsema, Petra
    JOURNAL OF INFORMATION TECHNOLOGY IN CONSTRUCTION, 2020, 25 : 374 - 397
  • [50] Research of Pipe Cutting and Support in the Pipe-Roof Pre-Construction Method
    Yang, Xian
    Liu, Yang
    Li, Yongsuo
    Yang, Zeyu
    FRONTIERS IN EARTH SCIENCE, 2022, 10