Early contractor involvement: a review of pre-construction service agreements

被引:4
|
作者
Finnie, David [1 ]
Ali, Naseem Ameer [2 ]
Park, Kenneth [3 ]
机构
[1] Otago Polytech, Coll Engn Construct & Living Sci, Construct, Dunedin, New Zealand
[2] Massey Univ, Sch Built Environm, Auckland, New Zealand
[3] Aston Univ, Coll Engn & Phys Sci, Dept Civil Engn, Construct Management & Engn, Birmingham, W Midlands, England
关键词
construction management; contracting; procurement;
D O I
10.1680/jmapl.20.00038
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Early contractor involvement involves engaging contractors to work with the client's design team during the pre-construction stage before agreeing on a construction stage contract. Despite the growing use of two-stage contracting, there is a lack of research into the forms of pre-construction service agreements and their effectiveness. This study aims to evaluate the optimal contract ingredients for a pre-construction stage agreement that can be used with a range of standard-form construction contracts based on industry preferences. Four agreements are critically evaluated: those of the Joint Contracts Tribunal and NEC3 and two bespoke agreements. Key ingredients were found to include scope of services, time obligations, design obligations, key personnel, price formation, confidentiality of material and communication and co-operation. Industry preferences were obtained through semi-structured interviews with 21 construction participants across New Zealand.
引用
收藏
页码:143 / 150
页数:8
相关论文
共 50 条
  • [1] Exploring Pre-Construction Activities in Infrastructure Projects That Can Benefit from Contractor Involvement
    Memic, Nadina
    Tadayon, Allen
    Olsson, Nils O. E.
    Wondimu, Paulos A.
    Ishtiaque, Tausif Ahmed
    Laedre, Ola
    [J]. BUILDINGS, 2023, 13 (10)
  • [2] When to Engage the Contractor for Pre-Construction Services in New Zealand
    van der Walt, Jacobus Daniel
    Botha, Paul Stephanus
    Scheepbouwer, Eric
    [J]. TRANSPORTATION RESEARCH RECORD, 2019, 2673 (02) : 562 - 570
  • [3] A systematic search and review of early contractor involvement in construction project development
    Osuizugbo, Innocent Chigozie
    Omer, Mazen M.
    Rahman, Rahimi A.
    Oshodi, Olalekan Shamsideen
    [J]. BUILT ENVIRONMENT PROJECT AND ASSET MANAGEMENT, 2024, 14 (06) : 835 - 857
  • [4] Narrative pre-construction
    Labov, William
    [J]. NARRATIVE INQUIRY, 2006, 16 (01) : 37 - 45
  • [5] Understanding Biases in Pre-Construction Estimates
    Lunacek, Monte
    Fields, M. Jason
    Craig, Anna
    Lee, Joseph C. Y.
    Meissner, John
    Philips, Caleb
    Sheng, Shuangwen
    King, Ryan
    [J]. SCIENCE OF MAKING TORQUE FROM WIND (TORQUE 2018), 2018, 1037
  • [6] Pre-construction testing (not) in sectionformat [trademark]
    Bushnell, Christopher G.
    [J]. Construction Specifier, 2002, 55 (04):
  • [7] Dilemma in Decision Making at Pre-construction Phase - A state of art review
    Nasir, Najuwa
    Nawi, Mohd Nasrun Mohd
    Tapa, Afiruddin
    [J]. PROCEEDINGS OF THE INTERNATIONAL CONFERENCE ON APPLIED SCIENCE AND TECHNOLOGY 2016 (ICAST '16), 2016, 1761
  • [8] A contractor's perception on early contractor involvement
    Rahman, Motiar
    Alhassan, Aminu
    [J]. BUILT ENVIRONMENT PROJECT AND ASSET MANAGEMENT, 2012, 2 (02) : 217 - 233
  • [9] Early Contractor Involvement in Design and Its Impact on Construction Schedule Performance
    Song, Lingguang
    Mohamed, Yasser
    AbouRizk, Simaan
    [J]. JOURNAL OF MANAGEMENT IN ENGINEERING, 2009, 25 (01) : 12 - 20
  • [10] The design coordination role at the pre-construction stage of construction projects
    Ndekugri, Issaka
    Ankrah, Nii A.
    Adaku, Ebenezer
    [J]. JOURNAL OF PLANNING LITERATURE, 2022, 37 (03) : 557 - 558