Exploring Pre-Construction Activities in Infrastructure Projects That Can Benefit from Contractor Involvement

被引:0
|
作者
Memic, Nadina [1 ]
Tadayon, Allen [1 ,2 ]
Olsson, Nils O. E. [3 ]
Wondimu, Paulos A. [1 ,4 ]
Ishtiaque, Tausif Ahmed [1 ]
Laedre, Ola [1 ]
机构
[1] Norwegian Univ Sci & Technol NTNU, Dept Civil & Environm Engn, N-7491 Trondheim, Norway
[2] Oslo Metropolitan Univ OsloMet, Dept Built Environm, N-0130 Oslo, Norway
[3] Norwegian Univ Sci & Technol NTNU, Dept Mech & Ind Engn, N-7491 Trondheim, Norway
[4] Norwegian Publ Rd Adm NPRA, N-0667 Oslo, Norway
关键词
ECI; infrastructure projects; pre-construction; activities; CRITICAL SUCCESS FACTORS; CONSTRUCTION PROJECTS; DESIGN PHASE; PERCEPTION;
D O I
10.3390/buildings13102569
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The pre-construction phase of public infrastructure projects is characterized by significant uncertainty as crucial decisions are made with limited information. This early stage of project development is influenced by a multitude of factors and input from various stakeholders. While early contractor involvement (ECI) offers potential benefits for both clients and projects, the timing and selection of tasks for involving the contractor are critical to achieving these benefits. This study seeks to identify key pre-construction activities in public infrastructure projects and pinpoint the activities that stand to gain the most from ECI. The research methodology involved conducting semi-structured interviews, organizing seven workshops, and conducting the literature and document studies. Through these efforts, the study identified a total of 20 pre-construction activities, among which 5 activities emerged as the most favorable candidates for ECI, while 5 others were deemed less suitable. The findings underscore a consensus that involving contractor expertise during the Brief Development sub-phase holds significant promise. Notably, activities associated with planning, environmental considerations, and technical aspects related to the scope clarification, were found to be highly amenable to ECI. Activities addressing uncertainty management received particular attention, with clients valuing contractors' practical experience in risk assessment and mitigation. Additionally, contractors' insights into planning, activity dependencies, and their contributions to health, safety, and environmental plans were highly regarded. However, activities, categorized under the more technical sub-phases of Concept Development and Detailed Engineering yielded mixed results, while those falling within the predominantly social and political domain and involving political processes and societal impact, were viewed as less suitable for early contractor involvement. These findings emphasize the need to adopt a systematic and consistent approach to pre-construction activities, highlighting that ECI should not be applied as a one-size-fits-all solution. The interview results somewhat contrast with the literature findings, which indicate that the early conceptual phase is most beneficial as the contractor impact is highest. To some extent, the client, contractor, and consultant still see their benefit and strategy before the good of the project.
引用
收藏
页数:24
相关论文
共 50 条
  • [1] Early contractor involvement: a review of pre-construction service agreements
    Finnie, David
    Ali, Naseem Ameer
    Park, Kenneth
    [J]. PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-MANAGEMENT PROCUREMENT AND LAW, 2022, 175 (04) : 143 - 150
  • [2] Exploring the dimensions of traditional authority influencing stakeholder management at the pre-construction stage of infrastructure projects
    Dansoh, Ayirebi
    Frimpong, Samuel
    Oppong, Goodenough Dennis
    [J]. CONSTRUCTION MANAGEMENT AND ECONOMICS, 2020, 38 (02) : 189 - 206
  • [3] Complexity Factors During Pre-Construction Stage Affecting Quality Performance in Infrastructure Projects
    Nen, Akhtarul Norfaiza Che
    Isa, Che Maznah Mat
    Nusa, Fatin Najwa Mohd
    Ibrahim, Che Khairil Izam Che
    [J]. 2020 11TH IEEE CONTROL AND SYSTEM GRADUATE RESEARCH COLLOQUIUM (ICSGRC), 2020, : 253 - 258
  • [4] When to Engage the Contractor for Pre-Construction Services in New Zealand
    van der Walt, Jacobus Daniel
    Botha, Paul Stephanus
    Scheepbouwer, Eric
    [J]. TRANSPORTATION RESEARCH RECORD, 2019, 2673 (02) : 562 - 570
  • [5] The design coordination role at the pre-construction stage of construction projects
    Ndekugri, Issaka
    Ankrah, Nii A.
    Adaku, Ebenezer
    [J]. JOURNAL OF PLANNING LITERATURE, 2022, 37 (03) : 557 - 558
  • [6] Social sustainability efficacy of construction projects in the pre-construction phase
    Sodangi, Mahmoud
    [J]. PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-ENGINEERING SUSTAINABILITY, 2019, 172 (02) : 57 - 67
  • [7] The design coordination role at the pre-construction stage of construction projects
    Ndekugri, Issaka
    Ankrah, Nii A.
    Adaku, Ebenezer
    [J]. BUILDING RESEARCH AND INFORMATION, 2022, 50 (04): : 452 - 466
  • [8] Delays in the Pre-Construction Phase of State Sector Building Projects
    Dolage, D. A. R.
    Perera, P. W. S. D.
    [J]. ENGINEER-JOURNAL OF THE INSTITUTION OF ENGINEERS SRI LANKA, 2009, 42 (03): : 22 - 30
  • [9] Exploring the integration of health and safety with pre-construction planning
    Hare, Billy
    Cameron, Iain
    Duff, A.
    [J]. ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2006, 13 (05) : 438 - +
  • [10] Pre-construction evaluation practices of sustainable housing projects in the UK
    Essa, Ranya
    Fortune, Chris
    [J]. ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2008, 15 (06) : 514 - +