SCaRC: Space-constrained resource-constrained scheduling system

被引:40
|
作者
Thabet, WY
Beliveau, YJ
机构
[1] VIRGINIA POLYTECH INST & STATE UNIV,DEPT CIVIL ENGN,BLACKSBURG,VA 24061
[2] VIRGINIA POLYTECH INST & STATE UNIV,DEPT BLDG CONSTR,BLACKSBURG,VA 24061
关键词
D O I
10.1061/(ASCE)0887-3801(1997)11:1(48)
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Current intelligent scheduling systems do not address the effect of limited work space on the generation of schedules. This paper describes SCaRC-Space-Constrained and Resource-Constrained knowledge-based system-for scheduling repetitive floors in multistory projects. The prototype system incorporates space-based scheduling techniques to recognize the space requirements of activities as a scheduling constraint. The space-based techniques are integrated with resource-based techniques for the production of schedules. The system also incorporates procedures to define and verify construction logic constraints associated with linear scheduling of vertical construction. An example illustrating the scheduling techniques implemented in SCaRC is presented.
引用
收藏
页码:48 / 59
页数:12
相关论文
共 50 条
  • [21] NONPREEMPTIVE MULTIMODE RESOURCE-CONSTRAINED PROJECT SCHEDULING
    DREXL, A
    GRUENEWALD, J
    IIE TRANSACTIONS, 1993, 25 (05) : 74 - 81
  • [22] Resource-constrained project scheduling problem with reworking
    Liao Y.
    Lu Z.
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2019, 25 (11): : 2762 - 2774
  • [23] Disruption management for resource-constrained project scheduling
    Zhu, G
    Bard, JF
    Yu, G
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2005, 56 (04) : 365 - 381
  • [24] An Extended CPM for Resource-constrained Project Scheduling
    Ju, C. H.
    Xie, Y.
    ULTRA-PRECISION MACHINING TECHNOLOGIES, 2009, 69-70 : 695 - 699
  • [25] A Practical Approach for Resource-Constrained Project Scheduling
    Manousakis, Konstantinos
    Savva, Giannis
    Papadouri, Nicos
    Mavrovouniotis, Michalis
    Christofides, Athanasios
    Kolokotroni, Nedi
    Ellinas, Georgios
    IEEE ACCESS, 2024, 12 : 12976 - 12991
  • [26] Resource-constrained formulation for production scheduling and maintenance
    Aguirre, Adrian M.
    Papageorgiou, Lazaros G.
    27TH EUROPEAN SYMPOSIUM ON COMPUTER AIDED PROCESS ENGINEERING, PT B, 2017, 40B : 1375 - 1380
  • [27] RESOURCE-CONSTRAINED PROJECT SCHEDULING - STATE OF ART
    HERROELEN, WS
    OPERATIONAL RESEARCH QUARTERLY, 1972, 23 (03) : 261 - +
  • [28] Approximate solution of a resource-constrained scheduling problem
    Sirdey, Renaud
    Carlier, Jacques
    Nace, Dritan
    JOURNAL OF HEURISTICS, 2009, 15 (01) : 1 - 17
  • [29] Resource-constrained scheduling with optional recycling operations
    Lin, Bertrand M. T.
    COMPUTERS & INDUSTRIAL ENGINEERING, 2015, 90 : 39 - 45
  • [30] A matheuristic for the resource-constrained project scheduling problem
    Vanhoucke, Mario
    Coelho, Jose
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2024, 319 (03) : 711 - 725