SCaRC: Space-constrained resource-constrained scheduling system

被引:40
|
作者
Thabet, WY
Beliveau, YJ
机构
[1] VIRGINIA POLYTECH INST & STATE UNIV,DEPT CIVIL ENGN,BLACKSBURG,VA 24061
[2] VIRGINIA POLYTECH INST & STATE UNIV,DEPT BLDG CONSTR,BLACKSBURG,VA 24061
关键词
D O I
10.1061/(ASCE)0887-3801(1997)11:1(48)
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Current intelligent scheduling systems do not address the effect of limited work space on the generation of schedules. This paper describes SCaRC-Space-Constrained and Resource-Constrained knowledge-based system-for scheduling repetitive floors in multistory projects. The prototype system incorporates space-based scheduling techniques to recognize the space requirements of activities as a scheduling constraint. The space-based techniques are integrated with resource-based techniques for the production of schedules. The system also incorporates procedures to define and verify construction logic constraints associated with linear scheduling of vertical construction. An example illustrating the scheduling techniques implemented in SCaRC is presented.
引用
收藏
页码:48 / 59
页数:12
相关论文
共 50 条
  • [31] Resource-Constrained Scheduling for Maritime Traffic Management
    Agussurja, Lucas
    Kumar, Akshat
    Lau, Hoong Chuin
    THIRTY-SECOND AAAI CONFERENCE ON ARTIFICIAL INTELLIGENCE / THIRTIETH INNOVATIVE APPLICATIONS OF ARTIFICIAL INTELLIGENCE CONFERENCE / EIGHTH AAAI SYMPOSIUM ON EDUCATIONAL ADVANCES IN ARTIFICIAL INTELLIGENCE, 2018, : 6086 - 6093
  • [32] Influence of learning in resource-constrained project scheduling
    Van Peteghem, Vincent
    Vanhoucke, Mario
    COMPUTERS & INDUSTRIAL ENGINEERING, 2015, 87 : 569 - 579
  • [33] A SURVEY ON THE RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM
    OZDAMAR, L
    ULUSOY, G
    IIE TRANSACTIONS, 1995, 27 (05) : 574 - 586
  • [34] Extensions of the resource-constrained project scheduling problem
    Ding, Hongyan
    Zhuang, Cunbo
    Liu, Jianhua
    AUTOMATION IN CONSTRUCTION, 2023, 153
  • [35] Approximate solution of a resource-constrained scheduling problem
    Renaud Sirdey
    Jacques Carlier
    Dritan Nace
    Journal of Heuristics, 2009, 15 : 1 - 17
  • [36] Resource-Constrained Project Scheduling in Hazardous Environment
    Li, Shuai
    Zhang, Zhicong
    Hu, Kaishun
    Zhao, Shaoyong
    Yan, Xiaohui
    2017 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2017, : 2266 - 2270
  • [37] Resource-Constrained Scheduling for Digital Microfluidic Biochips
    O'Neal, Kenneth
    Grissom, Daniel
    Brisk, Philip
    ACM JOURNAL ON EMERGING TECHNOLOGIES IN COMPUTING SYSTEMS, 2018, 14 (01)
  • [38] An iterative auction for resource-constrained surgical scheduling
    Liu, Lu
    Wang, Chun
    Wang, Jian-Jun
    Crespo, Antonio Marcio Ferreira
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2023, 74 (03) : 968 - 978
  • [39] RESOURCE-CONSTRAINED JOB SCHEDULING WITH RECYCLABLE RESOURCES
    SHEWCHUK, JP
    CHANG, TC
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1995, 81 (02) : 364 - 375
  • [40] CROSS cyclic resource-constrained scheduling solver
    Bonfietti, Alessio
    Lombardi, Michele
    Benini, Luca
    Milano, Michela
    ARTIFICIAL INTELLIGENCE, 2014, 206 : 25 - 52