CRITICALITY MEASURES FOR TIME CONSTRAINT TUNNELS IN SEMICONDUCTOR MANUFACTURING

被引:0
|
作者
Anthouard, Benjamin [1 ]
Borodin, Valeria [1 ]
Dauzere-Peres, Stephane [1 ]
Christ, Quentin [2 ]
Roussel, Renaud [2 ]
机构
[1] Univ Clermont Auvergne, Mines St Etienne, UMR 6158 LIMOS, CNRS, 880 Ave Mimet, F-13129 Gardanne, France
[2] STMicroelectronics, 850 Rue Jean Monnet, F-38920 Crolles, France
关键词
SHIFTING BOTTLENECK PROCEDURE;
D O I
暂无
中图分类号
TP301 [理论、方法];
学科分类号
081202 ;
摘要
Semiconductor manufacturing processes include more and more (queue) time constraints often spanning multiple operations, which impact both production efficiency and quality. After recalling the problem of time constraint management, this paper focuses on the notion of criticality defined in terms of time constraints at an operational decision level. Various criticality measures are presented. A discrete-event simulation-based approach is used to evaluate the criticality of machines for time constraints. Computational experiments conducted on industrial instances are discussed. The paper ends with some conclusions and perspectives.
引用
收藏
页码:3326 / 3337
页数:12
相关论文
共 50 条
  • [21] Automation: Key to Cycle Time Improvement in Semiconductor Manufacturing
    Sonar, Amit
    Shinde, Satyajit
    Teh, Susanto
    2013 24TH ANNUAL SEMI ADVANCED SEMICONDUCTOR MANUFACTURING CONFERENCE (ASMC), 2013, : 93 - 98
  • [22] Manufacturing intelligence to forecast and reduce semiconductor cycle time
    Chen-Fu Chien
    Chia-Yu Hsu
    Chih-Wei Hsiao
    Journal of Intelligent Manufacturing, 2012, 23 : 2281 - 2294
  • [23] Real-time machine vision for semiconductor manufacturing
    Polkowski, E
    REAL-TIME IMAGING II, 1997, 3028 : 48 - 52
  • [24] Scheduling for the Dedicated Machine Constraint in Semiconductor Manufacturing Using a Goal-Oriented Approach
    Pham, Huy Nguyen Anh
    Shr, Arthur
    Chen, Peter P.
    ICTAI: 2009 21ST INTERNATIONAL CONFERENCE ON TOOLS WITH ARTIFICIAL INTELLIGENCE, 2009, : 551 - 558
  • [25] SAFETY MEASURES IN ROAD TUNNELS
    Komic, Ivana
    Stanceric, Ivica
    Stepan, Zeljko
    ROAD AND RAIL INFRASTRUCTURE III, 2014, : 771 - 777
  • [26] Integrated Constraint Programming Scheduling Approach for Automated Wet-Etch Stations in Semiconductor Manufacturing
    Zeballos, Luis J.
    Castro, Pedro M.
    Mendez, Carlos A.
    INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 2011, 50 (03) : 1705 - 1715
  • [27] Processing Time Prediction Method Based on SVR in Semiconductor Manufacturing
    朱雪初
    乔非
    JournalofDonghuaUniversity(EnglishEdition), 2014, 31 (02) : 98 - 101
  • [28] Excursion Yield Loss and Cycle Time Reduction in Semiconductor Manufacturing
    Leachman, Robert C.
    Ding, Shengwei
    IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, 2011, 8 (01) : 112 - 117
  • [29] Modeling and control of time-pressure dispensing for semiconductor manufacturing
    Chen C.-P.
    Li H.-X.
    Ding H.
    Int. J. Autom. Comput., 2007, 4 (422-427): : 422 - 427
  • [30] Technique to Improve Visibility for Cycle Time Improvement in Semiconductor Manufacturing
    Ab Rahim, Syahril Ridzuan
    Ahmad, Ibrahim
    Chik, Mohd Azizi
    2012 10TH IEEE INTERNATIONAL CONFERENCE ON SEMICONDUCTOR ELECTRONICS (ICSE), 2012, : 627 - 630