共 50 条
- [33] A METHOD FOR CYCLE TIME ESTIMATION OF SEMICONDUCTOR MANUFACTURING TOOLSETS WITH CORRELATIONS PROCEEDINGS OF THE 2009 WINTER SIMULATION CONFERENCE (WSC 2009 ), VOL 1-4, 2009, : 1686 - +
- [34] Scheduling and control for time-constrained processes in semiconductor manufacturing ISSM 2005: IEEE International Symposium on Semiconductor Manufacturing, Conference Proceedings, 2005, : 295 - 298
- [35] The Improvement of Lot Delivery Time in 450 mm Semiconductor Manufacturing APPLIED MATHEMATICS & INFORMATION SCIENCES, 2014, 8 (06): : 2983 - 2990