A GENETIC ALGORITHM FOR PROJECT SCHEDULING IN ACTIVITY NETWORKS UNDER RESOURCE COMPLEMENTARITY

被引:0
|
作者
Silva, Helder [1 ]
Oliveira, Jose [2 ]
Tereso, Anabela [2 ]
机构
[1] Tecnol Amazonas, IFAM Inst Fed Educ, Manaus, Amazonas, Brazil
[2] Univ Minho, Dept Prod & Sistemas, P-4710057 Braga, Portugal
来源
ECEC' 2011:17TH EUROPEAN CONCURRENT ENGINEERING CONFERENCE / 7TH FUTURE BUSINESS TECHNOLOGY CONFERENCE | 2011年
关键词
Project Management; Scheduling; Complementarity of resources;
D O I
暂无
中图分类号
F [经济];
学科分类号
02 ;
摘要
We address the issue of optimal resource allocation, and more specifically, the analysis of complementarity of resources (primary resource or P-resource and supportive resource or S-resource) to activities in a project. The concept of complementarity can be incorporated into the engineering domain as an enhancement of the efficacy of a "primary" resource (P-resource) by adding to it other "supportive" resources (S-resources). We developed a Genetic Algorithm capable of determining the ideal mixture of resources allocated to the activities of a project, such that the project is completed with minimal cost. This problem has a circularity issue that greatly increases its complexity. In this paper we present a constructive algorithm to build solutions from a chromosome that will be integrated in a Genetic Algorithm, which we illustrate by application to a small instance of the problem. The Genetic Algorithm is based on a random keys chromosome that is very easy to implement and allows using conventional genetic operators for combinatorial optimization problems. A project is formed by a set of activities. Each activity uses a specific set of resources, and it is also necessary to guarantee that there is no overlap in the time it takes to process activities in the same resource.
引用
收藏
页码:95 / 99
页数:5
相关论文
共 50 条
  • [21] A new genetic algorithm for resource-constrained project scheduling problem
    Luo Ronggui
    Chen Xiaoming
    Huang Minmei
    PROCEEDINGS OF THE 3RD INTERNATIONAL CONFERENCE ON INNOVATION & MANAGEMENT, VOLS 1 AND 2, 2006, : 1595 - 1599
  • [22] Solving Resource-Constrained Project Scheduling Problem by Genetic Algorithm
    Kadam, Sachin U.
    Kadam, Narendra S.
    2014 2ND INTERNATIONAL CONFERENCE ON BUSINESS AND INFORMATION MANAGEMENT (ICBIM), 2014,
  • [23] A competitive Genetic Algorithm for resource-constrained project scheduling problem
    Wang, H
    Lin, D
    Li, MQ
    Proceedings of 2005 International Conference on Machine Learning and Cybernetics, Vols 1-9, 2005, : 2945 - 2949
  • [24] A genetic algorithm for the resource constrained multi-project scheduling problem
    Goncalves, J. F.
    Mendes, J. J. M.
    Resende, M. G. C.
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2008, 189 (03) : 1171 - 1190
  • [25] A genetic algorithm for solving resource-constrained project scheduling problem
    Wang, H
    Lin, D
    Li, MQ
    ADVANCES IN NATURAL COMPUTATION, PT 3, PROCEEDINGS, 2005, 3612 : 185 - 193
  • [26] Efficient Genetic Algorithm for Resource-Constrained Project Scheduling Problem
    王宏
    李同玲
    林丹
    Transactions of Tianjin University, 2010, (05) : 376 - 382
  • [27] A hybrid genetic algorithm for the resource-constrained project scheduling problem
    Valls, Vicente
    Ballestin, Francisco
    Quintanilla, Sacramento
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2008, 185 (02) : 495 - 508
  • [28] Fuzzy Flexible Resource Constrained Project Scheduling Based on Genetic Algorithm
    查鸿
    张连营
    Transactions of Tianjin University, 2014, (06) : 469 - 474
  • [29] Efficient Genetic Algorithm for Resource-Constrained Project Scheduling Problem
    王宏
    李同玲
    林丹
    Transactions of Tianjin University, 2010, 16 (05) : 376 - 382
  • [30] GASolver-A Solution to Resource Constrained Project Scheduling by Genetic Algorithm
    Madan, Mamta
    Madan, Rajneesh
    INTERNATIONAL JOURNAL OF ADVANCED COMPUTER SCIENCE AND APPLICATIONS, 2013, 4 (02) : 210 - 217