共 50 条
- [3] A genetic algorithm for solving fuzzy resource-constrained project scheduling [J]. ADVANCES IN NATURAL COMPUTATION, PT 3, PROCEEDINGS, 2005, 3612 : 171 - 180
- [4] A Flexible Heuristic Algorithm for Resource-Constrained Project Scheduling [J]. WCECS 2009: WORLD CONGRESS ON ENGINEERING AND COMPUTER SCIENCE, VOLS I AND II, 2009, : 730 - +
- [6] Resource-Constrained Project Scheduling Problem with Flexible Work Profiles: A Genetic Algorithm Approach [J]. SCIENTIA IRANICA TRANSACTION E-INDUSTRIAL ENGINEERING, 2010, 17 (01): : 25 - 35
- [8] A Genetic Hyperheuristic Algorithm for the Resource Constrained Project Scheduling Problem [J]. 2010 IEEE CONGRESS ON EVOLUTIONARY COMPUTATION (CEC), 2010,
- [9] Genetic algorithm for the resource-constrained project scheduling problem [J]. Automation and Remote Control, 2017, 78 : 1101 - 1114
- [10] Resource Constrained Project Scheduling of Construction Engineering with Genetic Algorithm [J]. 2008 CHINESE CONTROL AND DECISION CONFERENCE, VOLS 1-11, 2008, : 1466 - 1470