Fuzzy Flexible Resource Constrained Project Scheduling Based on Genetic Algorithm

被引:0
|
作者
查鸿 [1 ]
张连营 [1 ]
机构
[1] School of Management and Economics, Tianjin University
基金
中国国家自然科学基金;
关键词
project scheduling; fuzziness; flexibility; genetic algorithm; training;
D O I
暂无
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
Both fuzzy temporal constraint and flexible resource constraint are considered in project scheduling. In order to obtain an optimal schedule, we propose a genetic algorithm integrated with concepts on fuzzy set theory as well as specialized coding and decoding mechanism. An example demonstrates that the proposed approach can assist the project managers to obtain the optimal schedule effectively and make the correct decision on skill training before a project begins.
引用
收藏
页码:469 / 474
页数:6
相关论文
共 50 条
  • [31] A decomposition-based genetic algorithm for the resource-constrained project-scheduling problem
    Debels, Dieter
    Vanhoucke, Mario
    [J]. OPERATIONS RESEARCH, 2007, 55 (03) : 457 - 469
  • [32] Project Scheduling with Resource Constraints by Fuzzy Gantt Chart and Genetic Algorithm
    Tsai, Shang-En
    [J]. JOURNAL OF AERONAUTICS ASTRONAUTICS AND AVIATION, 2019, 51 (04): : 391 - 402
  • [33] An Immune Genetic Algorithm for Solving NPV-Based Resource Constrained Project Scheduling Problem
    Asadujjaman, Md.
    Rahman, Humyun Fuad
    Chakrabortty, Ripon K.
    Ryan, Michael J.
    [J]. IEEE ACCESS, 2021, 9 : 26177 - 26195
  • [34] Hybrid Genetic Algorithm with Simulated Annealing for Resource-Constrained Project Scheduling
    Bettemir, Onder Halis
    Sonmez, Rifat
    [J]. JOURNAL OF MANAGEMENT IN ENGINEERING, 2015, 31 (05)
  • [35] A Hybrid Genetic Algorithm for the Resource Constrained Multi-Project Scheduling Problem
    Li, Jinghua
    Liu, Wenjian
    [J]. ETFA 2005: 10TH IEEE INTERNATIONAL CONFERENCE ON EMERGING TECHNOLOGIES AND FACTORY AUTOMATION, VOL 2, PROCEEDINGS, 2005,
  • [36] A Genetic Algorithm with Neighborhood Search for the Resource-Constrained Project Scheduling Problem
    Proon, Sepehr
    Jin, Mingzhou
    [J]. NAVAL RESEARCH LOGISTICS, 2011, 58 (02) : 73 - 82
  • [37] A genetic algorithm for multi-mode resource constrained project scheduling problem
    Mori, M
    Tseng, CC
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1997, 100 (01) : 134 - 141
  • [38] Applying Genetic Algorithm to Resource Constrained Multi-Project Scheduling Problems
    Chen, James C.
    Jaong, Wun-Hao
    Sun, Cheng-Ju
    Lee, Hung-Yu
    Wu, Jenn-Sheng
    Ku, Chung-Chao
    [J]. ADVANCED DESIGN AND MANUFACTURE II, 2010, 419-420 : 633 - +
  • [39] Hybrid genetic algorithm for resource constrained multi-project scheduling problem
    Ying, Ying
    Shou, Yong-Yi
    Li, Min
    [J]. Zhejiang Daxue Xuebao (Gongxue Ban)/Journal of Zhejiang University (Engineering Science), 2009, 43 (01): : 23 - 27
  • [40] Effective genetic algorithm for resource-constrained project scheduling with limited preemptions
    Zhu, Jie
    Li, Xiaoping
    Shen, Weiming
    [J]. INTERNATIONAL JOURNAL OF MACHINE LEARNING AND CYBERNETICS, 2011, 2 (02) : 55 - 65