共 50 条
- [32] Project Scheduling with Resource Constraints by Fuzzy Gantt Chart and Genetic Algorithm [J]. JOURNAL OF AERONAUTICS ASTRONAUTICS AND AVIATION, 2019, 51 (04): : 391 - 402
- [35] A Hybrid Genetic Algorithm for the Resource Constrained Multi-Project Scheduling Problem [J]. ETFA 2005: 10TH IEEE INTERNATIONAL CONFERENCE ON EMERGING TECHNOLOGIES AND FACTORY AUTOMATION, VOL 2, PROCEEDINGS, 2005,
- [38] Applying Genetic Algorithm to Resource Constrained Multi-Project Scheduling Problems [J]. ADVANCED DESIGN AND MANUFACTURE II, 2010, 419-420 : 633 - +
- [39] Hybrid genetic algorithm for resource constrained multi-project scheduling problem [J]. Zhejiang Daxue Xuebao (Gongxue Ban)/Journal of Zhejiang University (Engineering Science), 2009, 43 (01): : 23 - 27