A genetic algorithm for solving fuzzy resource-constrained project scheduling

被引:0
|
作者
Wang, H [1 ]
Lin, D
Li, MQ
机构
[1] Tianjin Univ, Dept Math Sci, Tianjin 300072, Peoples R China
[2] Tianjin Univ, Inst Syst Engn, Tianjin 300072, Peoples R China
关键词
D O I
暂无
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
This paper studies the resource-constrained project scheduling problem with fuzzy activity duration and fuzzy deadline. On the basis of the concept of schedule robustness for fuzzy deadline and fuzzy project makespan, we seek for a schedule that maximizes the schedule robustness. First, An efficient genetic algorithm (GA) based on activity list representation is proposed for solving this problem, the performance of our GA and GA based on the priority value representation is compared. Second, we study the impact for the two different weak comparison rules (integral value method, distance method) in the performance of GA. The computational experiment shows that the performance of the proposed GA is better than GA appearing in the literature, there is no significant difference between the two weak comparison rules on the Performance of the algorithm.
引用
收藏
页码:171 / 180
页数:10
相关论文
共 50 条
  • [1] A genetic algorithm for solving resource-constrained project scheduling problem
    Wang, H
    Lin, D
    Li, MQ
    [J]. ADVANCES IN NATURAL COMPUTATION, PT 3, PROCEEDINGS, 2005, 3612 : 185 - 193
  • [2] Solving Resource-Constrained Project Scheduling Problem by Genetic Algorithm
    Kadam, Sachin U.
    Kadam, Narendra S.
    [J]. 2014 2ND INTERNATIONAL CONFERENCE ON BUSINESS AND INFORMATION MANAGEMENT (ICBIM), 2014,
  • [3] Solving Resource-Constrained Project Scheduling Problem via Genetic Algorithm
    Liu, Jia
    Liu, Yisheng
    Shi, Ying
    Li, Jian
    [J]. JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2020, 34 (02)
  • [4] A competitive genetic algorithm for resource-constrained project scheduling
    Hartmann, S
    [J]. NAVAL RESEARCH LOGISTICS, 1998, 45 (07) : 733 - 750
  • [5] Genetic algorithm for the resource-constrained project scheduling problem
    E. N. Goncharov
    V. V. Leonov
    [J]. Automation and Remote Control, 2017, 78 : 1101 - 1114
  • [6] Genetic algorithm for the resource-constrained project scheduling problem
    Goncharov, E. N.
    Leonov, V. V.
    [J]. AUTOMATION AND REMOTE CONTROL, 2017, 78 (06) : 1101 - 1114
  • [7] A competitive Genetic Algorithm for resource-constrained project scheduling problem
    Wang, H
    Lin, D
    Li, MQ
    [J]. Proceedings of 2005 International Conference on Machine Learning and Cybernetics, Vols 1-9, 2005, : 2945 - 2949
  • [8] Efficient Genetic Algorithm for Resource-Constrained Project Scheduling Problem
    王宏
    李同玲
    林丹
    [J]. Transactions of Tianjin University, 2010, (05) - 382
  • [9] A new genetic algorithm for resource-constrained project scheduling problem
    Luo Ronggui
    Chen Xiaoming
    Huang Minmei
    [J]. PROCEEDINGS OF THE 3RD INTERNATIONAL CONFERENCE ON INNOVATION & MANAGEMENT, VOLS 1 AND 2, 2006, : 1595 - 1599
  • [10] A hybrid genetic algorithm for the resource-constrained project scheduling problem
    Valls, Vicente
    Ballestin, Francisco
    Quintanilla, Sacramento
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2008, 185 (02) : 495 - 508