A GENETIC ALGORITHM FOR PROJECT SCHEDULING IN ACTIVITY NETWORKS UNDER RESOURCE COMPLEMENTARITY

被引:0
|
作者
Silva, Helder [1 ]
Oliveira, Jose [2 ]
Tereso, Anabela [2 ]
机构
[1] Tecnol Amazonas, IFAM Inst Fed Educ, Manaus, Amazonas, Brazil
[2] Univ Minho, Dept Prod & Sistemas, P-4710057 Braga, Portugal
来源
ECEC' 2011:17TH EUROPEAN CONCURRENT ENGINEERING CONFERENCE / 7TH FUTURE BUSINESS TECHNOLOGY CONFERENCE | 2011年
关键词
Project Management; Scheduling; Complementarity of resources;
D O I
暂无
中图分类号
F [经济];
学科分类号
02 ;
摘要
We address the issue of optimal resource allocation, and more specifically, the analysis of complementarity of resources (primary resource or P-resource and supportive resource or S-resource) to activities in a project. The concept of complementarity can be incorporated into the engineering domain as an enhancement of the efficacy of a "primary" resource (P-resource) by adding to it other "supportive" resources (S-resources). We developed a Genetic Algorithm capable of determining the ideal mixture of resources allocated to the activities of a project, such that the project is completed with minimal cost. This problem has a circularity issue that greatly increases its complexity. In this paper we present a constructive algorithm to build solutions from a chromosome that will be integrated in a Genetic Algorithm, which we illustrate by application to a small instance of the problem. The Genetic Algorithm is based on a random keys chromosome that is very easy to implement and allows using conventional genetic operators for combinatorial optimization problems. A project is formed by a set of activities. Each activity uses a specific set of resources, and it is also necessary to guarantee that there is no overlap in the time it takes to process activities in the same resource.
引用
收藏
页码:95 / 99
页数:5
相关论文
共 50 条
  • [31] Efficient genetic algorithm for resource-constrained project scheduling problem
    Wang H.
    Li T.
    Lin D.
    Transactions of Tianjin University, 2010, 16 (5) : 376 - 382
  • [32] A genetic algorithm for solving fuzzy resource-constrained project scheduling
    Wang, H
    Lin, D
    Li, MQ
    ADVANCES IN NATURAL COMPUTATION, PT 3, PROCEEDINGS, 2005, 3612 : 171 - 180
  • [33] Fuzzy flexible resource constrained project scheduling based on genetic algorithm
    Zha H.
    Zhang L.
    Transactions of Tianjin University, 2014, 20 (6) : 469 - 474
  • [34] Fuzzy Flexible Resource Constrained Project Scheduling Based on Genetic Algorithm
    查鸿
    张连营
    Transactions of Tianjin University, 2014, 20 (06) : 469 - 474
  • [35] A hybrid genetic and Lagrangian relaxation algorithm for resource-constrained project scheduling under nonrenewable resources
    Chaleshtarti, Ali Shirzadeh
    Shadrokh, Shahram
    Khakifirooz, Marzieh
    Fathi, Mahdi
    Pardalos, Panos M.
    APPLIED SOFT COMPUTING, 2020, 94 (94)
  • [36] An Artificial Immune Algorithm for the project scheduling problem under resource constraints
    Mobini, Mahdi
    Mobini, Zahra
    Rabbani, Masoud
    APPLIED SOFT COMPUTING, 2011, 11 (02) : 1975 - 1982
  • [37] A genetic algorithm with resource buffers for the resource-constrained multi-project scheduling problem
    Bredael, Dries
    Vanhoucke, Mario
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2024, 315 (02) : 19 - 34
  • [38] Applying Genetic Algorithm to Resource Constrained Multi-Project Scheduling Problems
    Chen, James C.
    Jaong, Wun-Hao
    Sun, Cheng-Ju
    Lee, Hung-Yu
    Wu, Jenn-Sheng
    Ku, Chung-Chao
    ADVANCED DESIGN AND MANUFACTURE II, 2010, 419-420 : 633 - +
  • [39] A random key based genetic algorithm for the resource constrained project scheduling problem
    Mendes, J. J. M.
    Goncalves, J. F.
    Resende, M. G. C.
    COMPUTERS & OPERATIONS RESEARCH, 2009, 36 (01) : 92 - 109
  • [40] AN EFFICIENT GENETIC ALGORITHM FOR DECENTRALIZED MULTI-PROJECT SCHEDULING WITH RESOURCE TRANSFERS
    Zhang, Jingwen
    Liu, Wanjun
    Liu, Wanlin
    JOURNAL OF INDUSTRIAL AND MANAGEMENT OPTIMIZATION, 2022, 18 (01) : 1 - 24