Short-term generation scheduling model of Fujian hydro system

被引:25
|
作者
Wang, Jinwen [1 ]
机构
[1] Huazhong Univ Sci & Technol, Sch Hydropower & Informat Engn, Wuhan 430074, Peoples R China
基金
美国国家科学基金会;
关键词
Large-scale hydro system; Optimization; Generation scheduling; Lagrangian decomposition;
D O I
10.1016/j.enconman.2008.12.004
中图分类号
O414.1 [热力学];
学科分类号
摘要
The Fujian hydropower system (FHS) is one of the provincial hydropower systems with the most complicated hydraulic topology in China. This paper describes an optimization program that is required by Fujian Electric Power Company Ltd. (FEPCL) to aid the shift engineers in making decisions with the short-term hydropower scheduling such that the generation benefit can be maximal. The problem involves 27 reservoirs and is formulated as a nonlinear and discrete programming. It is a very challenging task to solve such a large-scale problem. In this paper, the Lagrangian multipliers are introduced to decompose the primal problem into a hydro subproblem and many individual plant-based subproblems, which are respectively solved by the improved simplex-like method (SLM) and the dynamic programming (DP). A numerical example is given and the derived solution is very close to the optimal one, with the distance in benefit less than 0.004%. All the data needed for the numerical example are presented in detail for further tests and studies from more experts and researchers. (C) 2008 Elsevier Ltd. All rights reserved.
引用
收藏
页码:1085 / 1094
页数:10
相关论文
共 50 条
  • [41] Exploring Symmetry in a Short-Term Hydro Scheduling Problem: The Case of the Santo Antonio Hydro Plant
    Brito, Brunno H.
    Finardi, Erlon C.
    Takigawa, Fabricio Y. K.
    Pereira, Airton, I
    Gosmann, Rodrigo P.
    Weiss, Leonardo A.
    Fernandes, Argemiro
    Morais, Douglas T. S. de Assis
    [J]. JOURNAL OF WATER RESOURCES PLANNING AND MANAGEMENT, 2022, 148 (01)
  • [42] A SHORT-TERM PRODUCTION PLANNING AND SCHEDULING MODEL
    POURBABAI, B
    [J]. ENGINEERING COSTS AND PRODUCTION ECONOMICS, 1989, 18 (02): : 159 - 167
  • [43] MILP Based Robust Short-Term Scheduling for Wind-Thermal-Hydro Power System With Pumped Hydro Energy Storage
    Xia, Pei
    Deng, Changhong
    Chen, Yahong
    Yao, Weiwei
    [J]. IEEE ACCESS, 2019, 7 : 30261 - 30275
  • [44] An Improved Self-Adaptive Particle Swarm Optimization Approach for Short-Term Scheduling of Hydro System
    Liu, Shuangquan
    Wang, Jinwen
    [J]. 2009 INTERNATIONAL ASIA CONFERENCE ON INFORMATICS IN CONTROL, AUTOMATION, AND ROBOTICS, PROCEEDINGS, 2009, : 334 - 338
  • [45] Multi-objective Short-term Tandem Hydro Scheduling: MINLP Approach
    Sharma, Prakash Chand
    Abhyankar, A. R.
    [J]. PROCEEDINGS OF THE FIRST IEEE INTERNATIONAL CONFERENCE ON POWER ELECTRONICS, INTELLIGENT CONTROL AND ENERGY SYSTEMS (ICPEICES 2016), 2016,
  • [46] Theories and methodology of complementary hydro/photovoltaic operation: Applications to short-term scheduling
    An, Yuan
    Fang, Wei
    Ming, Bo
    Huang, Qiang
    [J]. JOURNAL OF RENEWABLE AND SUSTAINABLE ENERGY, 2015, 7 (06)
  • [47] A practical mixed integer linear programming based short-term hydro scheduling
    Chang, GW
    Su, CT
    [J]. IEEE/PES TRANSMISSION AND DISTRIBUTION CONFERENCE AND EXHIBITION 2002: ASIA PACIFIC, VOLS 1-3, CONFERENCE PROCEEDINGS: NEW WAVE OF T&D TECHNOLOGY FROM ASIA PACIFIC, 2002, : 1606 - 1610
  • [48] Coordinated Scheduling of Hydro-Thermal-Gas Systems in the Short-Term Horizon
    Talebi, Amir
    Sadeghi-Yazdankhah, Ahmad
    [J]. 34TH INTERNATIONAL POWER SYSTEM CONFERENCE (PSC2019), 2019, : 579 - 583
  • [49] Mixed-Integer Nonlinear Programming Approach for Short-Term Hydro Scheduling
    Catalao, J. P. S.
    Pousinho, H. M. I.
    Mendes, V. M. F.
    [J]. IEEE LATIN AMERICA TRANSACTIONS, 2010, 8 (06) : 658 - 663
  • [50] SHORT-TERM GENERATION SCHEDULING IN A SMALL AUTONOMOUS SYSTEM WITH UNCONVENTIONAL ENERGY-SOURCES
    BAKIRTZIS, AG
    DOKOPOULOS, PS
    [J]. IEEE TRANSACTIONS ON POWER SYSTEMS, 1988, 3 (03) : 1230 - 1236