A practical mixed integer linear programming based short-term hydro scheduling

被引:0
|
作者
Chang, GW [1 ]
Su, CT [1 ]
机构
[1] Natl Chung Cheng Univ, Dept Elect Engn, Chiayi 621, Taiwan
关键词
short-term hydro scheduling; mixed integer linear programming; interior point method; hydro operations planning;
D O I
暂无
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
This paper presents a practical method by using mixed integer linear programming for the short-term hydro scheduling (STHS). The STHS is used to determine the optimal or near-optimal schedules for the dispatchable hydro plants in a hydro-dominant system for a user-definable study period at each time step while respecting all system and hydraulic constraints. The problem can be modeled in detail for a hydro system that contains both conventional and pumped-storage units. Discrete and dynamic constraints such as plant startup and shutdown statuses are also included in the model. The STHS problem is solved with a commercial-grade MILP solver. The usefulness of the proposed solution algorithm is illustrated by testing the problem with actual hydraulic system data. Numerical experiences show that the solution technique is computationally efficient, simple, and suitable for decision support of short-term hydro operations planning.
引用
收藏
页码:1606 / 1610
页数:5
相关论文
共 50 条
  • [1] Experiences with mixed integer linear programming based approaches on short-term hydro scheduling
    Chang, GW
    Aganagic, M
    Waight, JG
    Medina, J
    Burton, T
    Reeves, S
    Christoforidis, M
    [J]. IEEE TRANSACTIONS ON POWER SYSTEMS, 2001, 16 (04) : 743 - 749
  • [2] Mixed-Integer Nonlinear Programming Approach for Short-Term Hydro Scheduling
    Catalao, J. P. S.
    Pousinho, H. M. I.
    Mendes, V. M. F.
    [J]. IEEE LATIN AMERICA TRANSACTIONS, 2010, 8 (06) : 658 - 663
  • [3] Mixed integer linear programming formulations for the hydro production function in a unit-based short-term scheduling problem
    Guisandez, Ignacio
    Ignacio Perez-Diaz, Juan
    [J]. INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2021, 128
  • [4] Short-term hydrothermal scheduling using mixed-integer linear programming
    State Key Laboratory for Manufacturing Systems Engineering, Xi'an Jiaotong University, Xi'an 710049, China
    [J]. Zhongguo Dianji Gongcheng Xuebao, 2009, 28 (82-88):
  • [5] Mixed-Integer Nonlinear Programming for Head-Dependent Short-Term Hydro Scheduling
    Catalao, J. P. S.
    Pousinho, H. M. I.
    Mendes, V. M. F.
    [J]. 2009 INTERNATIONAL CONFERENCE ON POWER ENGINEERING, ENERGY AND ELECTRICAL DRIVES, 2009, : 90 - +
  • [7] A mixed integer linear programming model for short-term open pit mine production scheduling
    Eivazy, H.
    Askari-Nasab, H.
    [J]. TRANSACTIONS OF THE INSTITUTIONS OF MINING AND METALLURGY SECTION A-MINING TECHNOLOGY, 2012, 121 (02): : 97 - 108
  • [8] Solution for short-term hydrothermal scheduling with a logarithmic size mixed-integer linear programming formulation
    Jian, Jinbao
    Pan, Shanshan
    Yang, Linfeng
    [J]. ENERGY, 2019, 171 : 770 - 784
  • [9] Modelling overflow using mixed integer programming in short-term hydropower scheduling
    Litlabo, Tormod
    Aaslid, Per
    Riise, Tarjei Lid
    Haugland, Dag
    [J]. ENERGY SYSTEMS-OPTIMIZATION MODELING SIMULATION AND ECONOMIC ASPECTS, 2023,
  • [10] Mixed-integer programming approach for short-term crude oil scheduling
    Moro, LFL
    Pinto, JM
    [J]. INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 2004, 43 (01) : 85 - 94