A mixed integer linear programming model for short-term open pit mine production scheduling

被引:48
|
作者
Eivazy, H. [1 ]
Askari-Nasab, H. [1 ]
机构
[1] Univ Alberta, Min Optimizat Lab, Edmonton, AB, Canada
关键词
Short-term production scheduling; Mixed integer linear programming; Open pit; Cost minimisation;
D O I
10.1179/1743286312Y.0000000006
中图分类号
TD [矿业工程];
学科分类号
0819 ;
摘要
Short-term production scheduling in open pit mines usually generates a scheme to enable mining operations to deliver the budgeted tonnes and grades to the mill while following the long-term mine plan. The goal of this paper is to develop and test an optimisation model for short-term open pit mine production scheduling. A multidestination mixed integer linear programming (MILP) model is proposed, which minimises the overall cost of mining operations including mining, processing, haulage, rehandling and rehabilitation costs. The model is solved by branch-and-cut algorithm using TOMLAB/CPLEX optimiser. The model incorporates buffer and blending stockpiles, horizontal directional mining, and decisions on ramps while controlling technical constraints. A monthly production schedule in an iron ore mine is developed over 12 months to illustrate the practicality of the developed model. Three scenarios with different mining horizontal directions are considered. The scenario with minimum number of drop-cuts is selected as the best practical schedule.
引用
收藏
页码:97 / 108
页数:12
相关论文
共 50 条
  • [1] Mixed Integer Linear Programming Model for Open Pit Mine Scheduling
    Aallaoui, S.
    Azzamouri, A.
    Tchernev, N.
    [J]. IFAC PAPERSONLINE, 2022, 55 (10): : 2276 - 2281
  • [2] Mixed integer linear programming formulations for open pit production scheduling
    Askari-Nasab H.
    Pourrahimian Y.
    Ben-Awuah E.
    Kalantari S.
    [J]. Journal of Mining Science, 2011, 47 (3) : 338 - 359
  • [3] MIXED INTEGER LINEAR PROGRAMMING FORMULATIONS FOR OPEN PIT PRODUCTION SCHEDULING
    Askari-Nasab, H.
    Pourrahimian, Y.
    Ben-Awuah, E.
    Kalantari, S.
    [J]. JOURNAL OF MINING SCIENCE, 2011, 47 (03) : 338 - 359
  • [4] Production Scheduling for Strategic Open Pit Mine Planning: A Mixed-Integer Programming Approach
    Rivera Letelier, Orlando
    Espinoza, Daniel
    Goycoolea, Marcos
    Moreno, Eduardo
    Munoz, Gonzalo
    [J]. OPERATIONS RESEARCH, 2020, 68 (05) : 1425 - 1444
  • [5] Short-term hydrothermal scheduling using mixed-integer linear programming
    State Key Laboratory for Manufacturing Systems Engineering, Xi'an Jiaotong University, Xi'an 710049, China
    [J]. Zhongguo Dianji Gongcheng Xuebao, 2009, 28 (82-88):
  • [6] A practical mixed integer linear programming based short-term hydro scheduling
    Chang, GW
    Su, CT
    [J]. IEEE/PES TRANSMISSION AND DISTRIBUTION CONFERENCE AND EXHIBITION 2002: ASIA PACIFIC, VOLS 1-3, CONFERENCE PROCEEDINGS: NEW WAVE OF T&D TECHNOLOGY FROM ASIA PACIFIC, 2002, : 1606 - 1610
  • [7] A practical, long-term production scheduling model in open pit mines using integer linear programming
    Gholamnejad, J.
    Lotfian, R.
    Kasmaeeyazdi, S.
    [J]. JOURNAL OF THE SOUTHERN AFRICAN INSTITUTE OF MINING AND METALLURGY, 2020, 120 (12) : 665 - 670
  • [8] Mixed integer programming model for short term planning in open-pit mines
    L'Heureux, G.
    Gamache, M.
    Soumis, F.
    [J]. TRANSACTIONS OF THE INSTITUTIONS OF MINING AND METALLURGY SECTION A-MINING TECHNOLOGY, 2013, 122 (02): : 101 - 109
  • [9] A PRACTICAL SHORT-TERM PRODUCTION SCHEDULING MODEL FOR OPEN PIT MINES
    Gholamnejad, Javad
    Bafghi, Alireza Yarahmadi
    [J]. SGEM 2008: 8TH INTERNATIONAL SCIENTIFIC CONFERENCE, VOL I, CONFERENCE PROCEEDINGS: MODERN MANAGEMENT OF MINE PRODUCING GEOLOGY AND ENVIRONMENTAL PROTECTION, 2008, : 333 - 338
  • [10] Experiences with mixed integer linear programming based approaches on short-term hydro scheduling
    Chang, GW
    Aganagic, M
    Waight, JG
    Medina, J
    Burton, T
    Reeves, S
    Christoforidis, M
    [J]. IEEE TRANSACTIONS ON POWER SYSTEMS, 2001, 16 (04) : 743 - 749