共 50 条
- [31] MINE SCHEDULING OPTIMIZATION WITH MIXED INTEGER PROGRAMMING [J]. MINING ENGINEERING, 1983, 35 (04) : 351 - 354
- [32] A Mixed Integer Linear Programming Model for Production Scheduling of Non-Pipelined Wells [J]. 2019 IEEE 15TH INTERNATIONAL CONFERENCE ON CONTROL AND AUTOMATION (ICCA), 2019, : 1397 - 1404
- [33] Mixed-Integer Nonlinear Programming for Head-Dependent Short-Term Hydro Scheduling [J]. 2009 INTERNATIONAL CONFERENCE ON POWER ENGINEERING, ENERGY AND ELECTRICAL DRIVES, 2009, : 90 - +
- [34] A CHANCE CONSTRAINED INTEGER PROGRAMMING MODEL FOR OPEN PIT LONG-TERM PRODUCTION PLANNING [J]. INTERNATIONAL JOURNAL OF ENGINEERING, 2008, 21 (04): : 407 - 418
- [36] A chance constrained Integer programming model for open pit long-term production planning [J]. Int. J. Eng. Trans. A Basics, 2008, 4 (407-418):
- [39] Stochastic optimisation of long-term production scheduling for open pit mines with a new integer programming formulation [J]. OREBODY MODELLING AND STRATEGIC MINE PLANNING: UNCERTAINTY AND RISK MANAGEMENT MODELS, 2005, (14): : 359 - 365
- [40] Automatic formation of short-term plan based on the long-term plan on open-pit mine using 0-1 integer programming [J]. Meitan Xuebao/Journal of the China Coal Society, 2012, 37 (07): : 1139 - 1143