Short-term generation scheduling model of Fujian hydro system

被引:25
|
作者
Wang, Jinwen [1 ]
机构
[1] Huazhong Univ Sci & Technol, Sch Hydropower & Informat Engn, Wuhan 430074, Peoples R China
基金
美国国家科学基金会;
关键词
Large-scale hydro system; Optimization; Generation scheduling; Lagrangian decomposition;
D O I
10.1016/j.enconman.2008.12.004
中图分类号
O414.1 [热力学];
学科分类号
摘要
The Fujian hydropower system (FHS) is one of the provincial hydropower systems with the most complicated hydraulic topology in China. This paper describes an optimization program that is required by Fujian Electric Power Company Ltd. (FEPCL) to aid the shift engineers in making decisions with the short-term hydropower scheduling such that the generation benefit can be maximal. The problem involves 27 reservoirs and is formulated as a nonlinear and discrete programming. It is a very challenging task to solve such a large-scale problem. In this paper, the Lagrangian multipliers are introduced to decompose the primal problem into a hydro subproblem and many individual plant-based subproblems, which are respectively solved by the improved simplex-like method (SLM) and the dynamic programming (DP). A numerical example is given and the derived solution is very close to the optimal one, with the distance in benefit less than 0.004%. All the data needed for the numerical example are presented in detail for further tests and studies from more experts and researchers. (C) 2008 Elsevier Ltd. All rights reserved.
引用
收藏
页码:1085 / 1094
页数:10
相关论文
共 50 条
  • [21] Short-term scheduling of a hydro-thermal system using linear programming technique
    Mwakabuta, N
    Kyaruzi, A
    [J]. IPEC 2003: Proceedings of the 6th International Power Engineering Conference, Vols 1 and 2, 2003, : 698 - 703
  • [22] Integrating long-and short-term models for hydro scheduling
    Mo, B
    Haugstad, A
    Fosso, OB
    [J]. HYDROPOWER '97, 1997, : 279 - 285
  • [23] OPTIMAL SHORT-TERM HYDRO SCHEDULING INCLUDING SECURITY CONSTRAINTS
    JOHANNESEN, A
    GJELSVIK, A
    FOSSO, OB
    FLATABO, N
    [J]. IEEE TRANSACTIONS ON POWER SYSTEMS, 1991, 6 (02) : 576 - 583
  • [24] Application of grey linear programming to short-term hydro scheduling
    Liang, RH
    [J]. ELECTRIC POWER SYSTEMS RESEARCH, 1997, 41 (03) : 159 - 165
  • [25] A SHORT-TERM HYDROTHERMAL SCHEDULING APPROACH FOR DOMINANTLY HYDRO SYSTEMS
    OHISHI, T
    SOARES, S
    CARVALHO, MFH
    [J]. IEEE TRANSACTIONS ON POWER SYSTEMS, 1991, 6 (02) : 637 - 643
  • [26] Short-term hydrothermal generation scheduling model using a genetic algorithm
    Gil, E
    Bustos, J
    Rudnick, H
    [J]. IEEE TRANSACTIONS ON POWER SYSTEMS, 2003, 18 (04) : 1256 - 1264
  • [27] SHORT-TERM GENERATION SCHEDULING WITH SECURITY CONSTRAINTS
    BRANNLUND, H
    SJELVGREN, D
    BUBENKO, JA
    [J]. IEEE TRANSACTIONS ON POWER SYSTEMS, 1988, 3 (01) : 310 - 316
  • [28] An MILP Based Formulation for Short-Term Hydro Generation Scheduling With Analysis of the Linearization Effects on Solution Feasibility
    Tong, Bo
    Zhai, Qiaozhu
    Guan, Xiaohong
    [J]. IEEE TRANSACTIONS ON POWER SYSTEMS, 2013, 28 (04) : 3588 - 3599
  • [29] Profit-based short-term hydro scheduling considering head-dependent power generation
    Mariano, S. J. P. S.
    Catalao, J. P. S.
    Mendes, V. M. F.
    Ferreira, L. A. F. M.
    [J]. 2007 IEEE LAUSANNE POWERTECH, VOLS 1-5, 2007, : 1362 - +
  • [30] Head-dependent maximum power generation in short-term hydro scheduling using nonlinear programming
    Mariano, Silvio J. P. S.
    Catalao, Joao P. S.
    Mendes, Victor M. F.
    Ferreira, Luis A. F. M.
    [J]. PROCEEDINGS OF THE SEVENTH IASTED INTERNATIONAL CONFERENCE ON POWER AND ENERGY SYSTEMS, 2007, : 247 - +