Exploring Symmetry in a Short-Term Hydro Scheduling Problem: The Case of the Santo Antonio Hydro Plant

被引:8
|
作者
Brito, Brunno H. [1 ,2 ]
Finardi, Erlon C. [3 ,4 ]
Takigawa, Fabricio Y. K. [5 ]
Pereira, Airton, I [6 ]
Gosmann, Rodrigo P. [6 ]
Weiss, Leonardo A. [6 ]
Fernandes, Argemiro [7 ]
Morais, Douglas T. S. de Assis [7 ]
机构
[1] Fed Inst Tocantins, Articulated Teaching Nucleus Control & Ind Proc, BR-77020450 Palmas, Brazil
[2] Univ Fed Santa Catarina, Dept Elect Engn, BR-88040900 Florianopolis, SC, Brazil
[3] Univ Fed Santa Catarina, Dept Elect & Elect Engn, BR-88040900 Florianopolis, SC, Brazil
[4] Inst Engn Syst & Comp Res & Dev Brazil, BR-11055300 Santos, SP, Brazil
[5] Fed Inst Santa Catarina, Dept Elect Engn, BR-88020300 Florianopolis, SC, Brazil
[6] REIVAX Automat & Control, Dept Res & Amp Dev, BR-88030904 Florianopolis, SC, Brazil
[7] Santo Antonio Energia, Dept Plant Operat, BR-76820136 Porto Velho, Brazil
关键词
UNIT COMMITMENT PROBLEM; GENERATION; DISPATCH; SYSTEM; MODEL;
D O I
10.1061/(ASCE)WR.1943-5452.0001495
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The Santo Antonio is the fifth largest hydro plant in Brazil. Due to the environmental constraints, the plant follows a run-of-river operation and, to handle inflow variability, possesses the 50 most oversized bulb generating units (GUs) in the world. These issues render a challenging short-term hydro scheduling problem (STHS), where the critical aspect is modeling the hydropower function (HPF). In this context, this article proposes a two-step strategy based on mixed-integer linear programming (MILP) to solve the STHS, that: (1) explores the symmetry related to the identical GUs by applying a binary expansion to find which units will be active, and (2) obtain the optimal load distribution by linearizing a series of nonlinear problems. In both steps, the HPF is linearized using the logarithmic aggregated convex combination (LACC) model. The symmetry exploration based on the binary expansion is new in the context of the STHS. The experiments show that the proposed strategy yields equal solutions to those obtained by an individual-LACC approach while providing, on average, a 74% reduction in computational time. (C) 2021 American Society of Civil Engineers.
引用
收藏
页数:12
相关论文
共 50 条
  • [1] A Review of Short-Term Hydro Scheduling Tools
    Osorio, G. J.
    Matias, J. C. O.
    Catalao, J. P. S.
    [J]. 2013 48TH INTERNATIONAL UNIVERSITIES' POWER ENGINEERING CONFERENCE (UPEC), 2013,
  • [2] Aggregated Hydro Unit Based Model for Short-term Hydro Generation Scheduling
    Zhai, Qiaozhu
    Xiao, Xun
    Li, Xuan
    [J]. 26TH CHINESE CONTROL AND DECISION CONFERENCE (2014 CCDC), 2014, : 4454 - 4459
  • [3] Short-term hydro scheduling in a liberalized power system
    Fosso, OB
    Belsnes, MM
    [J]. 2004 International Conference on Power System Technology - POWERCON, Vols 1 and 2, 2004, : 1321 - 1326
  • [4] A note on short-term hydro-thermal scheduling
    Esmaeily, Ali
    Raeisi, Fatima
    Ahmadi, Abdollah
    Ahmadi, Mohammad Reza
    [J]. ENERGY CONVERSION AND MANAGEMENT, 2016, 126 : 1178 - 1186
  • [5] The BC Hydro Short Term hydro scheduling Optimization Model
    Shawwash, ZK
    Siu, TK
    Russell, SO
    [J]. PROCEEDINGS OF THE 21ST INTERNATIONAL CONFERENCE ON POWER INDUSTRY COMPUTER APPLICATIONS, 1999, : 183 - 189
  • [6] The BC Hydro Short Term hydro scheduling optimization model
    Shawwash, ZK
    Siu, TK
    Russell, SOD
    [J]. IEEE TRANSACTIONS ON POWER SYSTEMS, 2000, 15 (03) : 1125 - 1131
  • [7] Integrating long-and short-term models for hydro scheduling
    Mo, B
    Haugstad, A
    Fosso, OB
    [J]. HYDROPOWER '97, 1997, : 279 - 285
  • [8] Short-term generation scheduling model of Fujian hydro system
    Wang, Jinwen
    [J]. ENERGY CONVERSION AND MANAGEMENT, 2009, 50 (04) : 1085 - 1094
  • [9] OPTIMAL SHORT-TERM HYDRO SCHEDULING INCLUDING SECURITY CONSTRAINTS
    JOHANNESEN, A
    GJELSVIK, A
    FOSSO, OB
    FLATABO, N
    [J]. IEEE TRANSACTIONS ON POWER SYSTEMS, 1991, 6 (02) : 576 - 583
  • [10] A SHORT-TERM HYDROTHERMAL SCHEDULING APPROACH FOR DOMINANTLY HYDRO SYSTEMS
    OHISHI, T
    SOARES, S
    CARVALHO, MFH
    [J]. IEEE TRANSACTIONS ON POWER SYSTEMS, 1991, 6 (02) : 637 - 643