Short-term generation scheduling model of Fujian hydro system

被引:25
|
作者
Wang, Jinwen [1 ]
机构
[1] Huazhong Univ Sci & Technol, Sch Hydropower & Informat Engn, Wuhan 430074, Peoples R China
基金
美国国家科学基金会;
关键词
Large-scale hydro system; Optimization; Generation scheduling; Lagrangian decomposition;
D O I
10.1016/j.enconman.2008.12.004
中图分类号
O414.1 [热力学];
学科分类号
摘要
The Fujian hydropower system (FHS) is one of the provincial hydropower systems with the most complicated hydraulic topology in China. This paper describes an optimization program that is required by Fujian Electric Power Company Ltd. (FEPCL) to aid the shift engineers in making decisions with the short-term hydropower scheduling such that the generation benefit can be maximal. The problem involves 27 reservoirs and is formulated as a nonlinear and discrete programming. It is a very challenging task to solve such a large-scale problem. In this paper, the Lagrangian multipliers are introduced to decompose the primal problem into a hydro subproblem and many individual plant-based subproblems, which are respectively solved by the improved simplex-like method (SLM) and the dynamic programming (DP). A numerical example is given and the derived solution is very close to the optimal one, with the distance in benefit less than 0.004%. All the data needed for the numerical example are presented in detail for further tests and studies from more experts and researchers. (C) 2008 Elsevier Ltd. All rights reserved.
引用
收藏
页码:1085 / 1094
页数:10
相关论文
共 50 条
  • [1] Aggregated Hydro Unit Based Model for Short-term Hydro Generation Scheduling
    Zhai, Qiaozhu
    Xiao, Xun
    Li, Xuan
    [J]. 26TH CHINESE CONTROL AND DECISION CONFERENCE (2014 CCDC), 2014, : 4454 - 4459
  • [2] Short-term hydro scheduling in a liberalized power system
    Fosso, OB
    Belsnes, MM
    [J]. 2004 International Conference on Power System Technology - POWERCON, Vols 1 and 2, 2004, : 1321 - 1326
  • [3] Short-term hydro generation and interchange contract scheduling for Swiss Rail
    Awobamise, B
    Frowd, RJ
    Rahimi, FA
    Tong, S
    Aganagic, M
    [J]. IEEE TRANSACTIONS ON POWER SYSTEMS, 1996, 11 (01) : 274 - 280
  • [4] A Review of Short-Term Hydro Scheduling Tools
    Osorio, G. J.
    Matias, J. C. O.
    Catalao, J. P. S.
    [J]. 2013 48TH INTERNATIONAL UNIVERSITIES' POWER ENGINEERING CONFERENCE (UPEC), 2013,
  • [5] A hybrid chaotic genetic algorithm for short-term hydro system scheduling
    Yuan, XH
    Yuan, YB
    Zhang, YC
    [J]. MATHEMATICS AND COMPUTERS IN SIMULATION, 2002, 59 (04) : 319 - 327
  • [6] A Unit Commitment Algorithm and a Compact MILP Model for Short-Term Hydro-Power Generation Scheduling
    Guedes, Lucas S. M.
    Maia, Pedro de Mendonca
    Lisboa, Adriano Chaves
    Gomes Vieira, Douglas Alexandre
    Saldanha, Rodney Rezende
    [J]. IEEE TRANSACTIONS ON POWER SYSTEMS, 2017, 32 (05) : 3381 - 3390
  • [7] A note on short-term hydro-thermal scheduling
    Esmaeily, Ali
    Raeisi, Fatima
    Ahmadi, Abdollah
    Ahmadi, Mohammad Reza
    [J]. ENERGY CONVERSION AND MANAGEMENT, 2016, 126 : 1178 - 1186
  • [8] The BC Hydro Short Term hydro scheduling Optimization Model
    Shawwash, ZK
    Siu, TK
    Russell, SO
    [J]. PROCEEDINGS OF THE 21ST INTERNATIONAL CONFERENCE ON POWER INDUSTRY COMPUTER APPLICATIONS, 1999, : 183 - 189
  • [9] Application of a Fast Evolutionary Algorithm to Short-term Hydro-thermal Generation Scheduling
    Turkay, B.
    Mecitoglu, F.
    Baran, S.
    [J]. ENERGY SOURCES PART B-ECONOMICS PLANNING AND POLICY, 2011, 6 (04) : 395 - 405
  • [10] A diploid genetic approach to short-term scheduling of hydro-thermal system
    Wu, YG
    Ho, CY
    Wang, DY
    [J]. IEEE TRANSACTIONS ON POWER SYSTEMS, 2000, 15 (04) : 1268 - 1274