Heuristics for assembly operation scheduling problem in flexible assembly systems

被引:4
|
作者
Jeong, Bongju
Sim, Seung-Bae
Jung, Hosang [1 ]
机构
[1] Virginia Polytech Inst & State Univ, Grado Dept Ind & Syst Engn, Blacksburg, VA 24061 USA
[2] Yonsei Univ, Dept Informat & Ind Engn, Seodaemun Ku, Seoul 120749, South Korea
[3] Korea Inst Def Analyses, Ctr Def Informationalizat Studies, Seoul 130650, South Korea
关键词
assembly operation; flexible assembly systems; parallel processors scheduling problem;
D O I
10.1007/s00170-005-2605-1
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
In this paper we address the problem of scheduling n assembly operations with in-tree constraints on m unrelated parallel workstations in flexible assembly systems, which we call the assembly operation scheduling problem (AOSP). No preemption of assembly operations is allowed and the primary objective is to minimize the maximum completion time. This problem is equivalent to R vertical bar tree vertical bar C-max. For this notorious NP-hard problem, four heuristic algorithms including decomposition (DECOMP), earliest completion time (ECT), shortest processing time (SPT), and earliest starting time(EST) heuristic are proposed and their performances are comparatively investigated. DECOMP uses a decomposition technique to practically solve this problem. The assembly operation tree is decomposed and then AOSP is reduced to a set of subproblems of R vertical bar vertical bar C-max and R,r(j)vertical bar r(i)vertical bar C-max. Two efficient heuristics were proposed for the reduced subproblems. The other three heuristics basically use the machine selection rules to determine the machine for processing the current operation. Of these heuristics, DECOMP showed the best performance in terms of quality of schedule. Computational results show that all the proposed algorithms except the EST heuristic perform quite well in terms of both quality of solution and computation time.
引用
收藏
页码:1033 / 1040
页数:8
相关论文
共 50 条
  • [1] Heuristics for assembly operation scheduling problem in flexible assembly systems
    Bongju Jeong
    Seung-Bae Sim
    Hosang Jung
    The International Journal of Advanced Manufacturing Technology, 2006, 29 : 1033 - 1040
  • [2] FLEXIBLE ASSEMBLY SYSTEMS - THE SCHEDULING PROBLEM FOR MULTIPLE PRODUCTS
    DONATH, M
    GRAVES, RJ
    CARLSON, DA
    JOURNAL OF MANUFACTURING SYSTEMS, 1989, 8 (01) : 27 - 34
  • [3] Evaluation of assembly sequences using generalized flexible assembly systems scheduling problem
    Jeong, BJ
    COMPUTERS & INDUSTRIAL ENGINEERING, 1997, 33 (3-4) : 777 - 780
  • [4] Evaluation of assembly sequences using generalized flexible assembly systems scheduling problem
    Jeong, B.J.
    Computers and Industrial Engineering, 1997, 33 (3-4): : 777 - 780
  • [5] The distributed assembly permutation flowshop scheduling problem with flexible assembly and batch delivery
    Yang, Shengluo
    Xu, Zhigang
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2021, 59 (13) : 4053 - 4071
  • [6] PROGRAMMING, SCHEDULING, AND CONTROL OF FLEXIBLE ASSEMBLY SYSTEMS
    VALCKENAERS, P
    VANBRUSSEL, H
    BONGAERTS, L
    BONNEVILLE, F
    COMPUTERS IN INDUSTRY, 1995, 26 (03) : 209 - 218
  • [7] Heuristics for a Distributed Parallel Machine Assembly Scheduling Problem with Eligibility Constraints
    Hatami, Sara
    Ruiz, Ruben
    Andres-Romano, Carlos
    2015 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND SYSTEMS MANAGEMENT (IESM), 2015, : 145 - 153
  • [8] Effective constructive heuristics and meta-heuristics for the distributed assembly permutation flowshop scheduling problem
    Pan, Quan-Ke
    Gao, Liang
    Li Xin-Yu
    Jose, Framinan M.
    APPLIED SOFT COMPUTING, 2019, 81
  • [9] Iterative Widen Heuristic Beam Search Algorithm for Scheduling Problem of Flexible Assembly Systems
    Li, Xiaoling
    Xing, Keyi
    IEEE TRANSACTIONS ON INDUSTRIAL INFORMATICS, 2021, 17 (11) : 7348 - 7358
  • [10] Scheduling Flexible Assembly Systems with Taboo Search Algorithm
    Zhao Liang-hui
    Wang Sheng-fa
    ECBI: 2009 INTERNATIONAL CONFERENCE ON ELECTRONIC COMMERCE AND BUSINESS INTELLIGENCE, PROCEEDINGS, 2009, : 172 - +