PROGRAMMING, SCHEDULING, AND CONTROL OF FLEXIBLE ASSEMBLY SYSTEMS

被引:22
|
作者
VALCKENAERS, P
VANBRUSSEL, H
BONGAERTS, L
BONNEVILLE, F
机构
[1] Katholieke Universiteit Leuven, Mechanical Engineering Department, B-3001 Leuven
关键词
MULTIAGENT SYSTEMS; HOLONIC SYSTEMS; CIME; CONTROL; SCHEDULING;
D O I
10.1016/0166-3615(95)00013-T
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
This paper surveys the research results on flexible assembly systems at the Mechanical Engineering Department of the Katholieke Universiteit Leuven. In the first section, it describes the overall architecture of the pilot assembly system. The second section surveys the programming methodology employed for the manufacturing equipment. The third section presents the control system and discusses its capabilities. The fourth section addresses the development and the integration of an on-line reactive scheduler. Finally, the last section discusses a benchmark that was performed in the framework of the fifth IMS test case.
引用
收藏
页码:209 / 218
页数:10
相关论文
共 50 条
  • [1] Loading and scheduling of a flexible assembly system by mixed integer programming
    Sawik, T
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2004, 154 (01) : 1 - 19
  • [2] Heuristics for assembly operation scheduling problem in flexible assembly systems
    Jeong, Bongju
    Sim, Seung-Bae
    Jung, Hosang
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2006, 29 (9-10): : 1033 - 1040
  • [3] Heuristics for assembly operation scheduling problem in flexible assembly systems
    Bongju Jeong
    Seung-Bae Sim
    Hosang Jung
    [J]. The International Journal of Advanced Manufacturing Technology, 2006, 29 : 1033 - 1040
  • [4] Scheduling Flexible Assembly Systems with Taboo Search Algorithm
    Zhao Liang-hui
    Wang Sheng-fa
    [J]. ECBI: 2009 INTERNATIONAL CONFERENCE ON ELECTRONIC COMMERCE AND BUSINESS INTELLIGENCE, PROCEEDINGS, 2009, : 172 - +
  • [5] FLEXIBLE ASSEMBLY SYSTEMS - THE SCHEDULING PROBLEM FOR MULTIPLE PRODUCTS
    DONATH, M
    GRAVES, RJ
    CARLSON, DA
    [J]. JOURNAL OF MANUFACTURING SYSTEMS, 1989, 8 (01) : 27 - 34
  • [6] Evaluation of assembly sequences using generalized flexible assembly systems scheduling problem
    Jeong, BJ
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 1997, 33 (3-4) : 777 - 780
  • [7] Scheduling and operator control in reconfigurable assembly systems
    Gyulai, David
    Kadar, Botond
    Monostori, Laszlo
    [J]. MANUFACTURING SYSTEMS 4.0, 2017, 63 : 459 - 464
  • [8] Simultaneous versus sequential loading and scheduling of flexible assembly systems
    Sawik, T
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2000, 38 (14) : 3267 - 3282
  • [9] Optimal routing and scheduling in flexible manufacturing systems using integer programming
    Cogill, Randy
    Hindi, Haitharn
    [J]. PROCEEDINGS OF THE 46TH IEEE CONFERENCE ON DECISION AND CONTROL, VOLS 1-14, 2007, : 5375 - +
  • [10] INTEGER PROGRAMMING-MODELS FOR THE DESIGN AND BALANCING OF FLEXIBLE ASSEMBLY SYSTEMS
    SAWIK, T
    [J]. MATHEMATICAL AND COMPUTER MODELLING, 1995, 21 (04) : 1 - 12