共 50 条
- [1] Heuristics for assembly operation scheduling problem in flexible assembly systems [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2006, 29 (9-10): : 1033 - 1040
- [2] Heuristics for assembly operation scheduling problem in flexible assembly systems [J]. The International Journal of Advanced Manufacturing Technology, 2006, 29 : 1033 - 1040
- [7] Scheduling Flexible Assembly Systems with Taboo Search Algorithm [J]. ECBI: 2009 INTERNATIONAL CONFERENCE ON ELECTRONIC COMMERCE AND BUSINESS INTELLIGENCE, PROCEEDINGS, 2009, : 172 - +
- [8] Hybrid flow shop scheduling problem with flexible and complex assembly [J]. 2023 35TH CHINESE CONTROL AND DECISION CONFERENCE, CCDC, 2023, : 88 - 93
- [9] EVALUATION AND SEARCH OF ASSEMBLY SEQUENCES IN LARGE SYSTEMS [J]. PROCEEDINGS OF THE ASME INTERNATIONAL DESIGN ENGINEERING TECHNICAL CONFERENCES AND COMPUTERS AND INFORMATION IN ENGINEERING CONFERENCE, 2013, VOL 2A, 2014,
- [10] Scheduling Flexible Assembly Lines Using Differential Evolution [J]. SWARM, EVOLUTIONARY, AND MEMETIC COMPUTING, PT I, 2011, 7076 : 43 - 50