The distributed assembly permutation flowshop scheduling problem with flexible assembly and batch delivery

被引:64
|
作者
Yang, Shengluo [1 ,2 ,3 ]
Xu, Zhigang [1 ,2 ]
机构
[1] Chinese Acad Sci, Shenyang Inst Automat, Shenyang, Peoples R China
[2] Chinese Acad Sci, Inst Robot & Intelligent Mfg, Shenyang, Peoples R China
[3] Univ Chinese Acad Sci, Beijing, Peoples R China
关键词
scheduling; distributed assembly flowshop; variable neighbourhood descent; iterated greedy; batch delivery; flexible assembly; ITERATED GREEDY ALGORITHM; SUPPLY CHAIN; INTEGRATED PRODUCTION; MINIMIZING MAKESPAN; MULTIPLE CUSTOMERS; TOTAL FLOWTIME; SHOP; HEURISTICS; TARDINESS; TRANSPORTATION;
D O I
10.1080/00207543.2020.1757174
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The scheduling problems of distributed production have received increasing attention in recent years. To coordinate the scheduling of production and transportation, we propose a novel distributed assembly permutation flowshop scheduling problem with flexible assembly and batch delivery (DAPFSP-FABD). The objective is to minimise the total cost of delivery and tardiness. Given that the problem involves six successive decisions, several batch allocation strategies for both production and distribution are proposed, and four neighbourhood structures are designed to search for the best batch sequence, batch allocation, product sequence, and job sequence. Seven algorithms, including four heuristics, a variable neighbourhood descent (VND) algorithm, and two iterated greedy (IG) algorithms, are proposed. In the IG, two types of destruction and construction operations are present to facilitate escape from local optima, thereby resulting in two IG algorithms: IG_desP and IG_desJ. Finally, extensive computational and statistical experiments are carried out. The results show that the proposed batch allocation strategies can improve the solution significantly. Additionally, the heuristics can obtain reasonable solutions in a short time, while IG_desJ performs the best regarding the quality of solutions. This study can help cross-regional companies coordinate the scheduling of production and transportation and enhance the performance of supply chains.
引用
收藏
页码:4053 / 4071
页数:19
相关论文
共 50 条
  • [1] The Distributed Assembly Permutation Flowshop Scheduling Problem
    Hatami, Sara
    Ruiz, Ruben
    Andres-Romano, Carlos
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2013, 51 (17) : 5292 - 5308
  • [2] Survey on Distributed Assembly Permutation Flowshop Scheduling Problem
    Zhang, Jing
    Song, Hongbo
    Lin, Jian
    Computer Engineering and Applications, 2024, 60 (06) : 1 - 9
  • [3] A genetic algorithm for the distributed assembly permutation flowshop scheduling problem
    Li, Xiangtao
    Zhang, Xin
    Yin, Minghao
    Wang, Jianan
    2015 IEEE CONGRESS ON EVOLUTIONARY COMPUTATION (CEC), 2015, : 3096 - 3101
  • [4] An enhanced genetic algorithm for the distributed assembly permutation flowshop scheduling problem
    Zhang, Xin
    Li, Xiang-Tao
    Yin, Ming-Hao
    INTERNATIONAL JOURNAL OF BIO-INSPIRED COMPUTATION, 2020, 15 (02) : 113 - 124
  • [5] An improved iterated greedy algorithm for the distributed assembly permutation flowshop scheduling problem
    Huang, Ying-Ying
    Pan, Quan-Ke
    Huang, Jiang-Ping
    Suganthan, P. N.
    Gao, Liang
    COMPUTERS & INDUSTRIAL ENGINEERING, 2021, 152
  • [6] Memetic Algorithm With Meta-Lamarckian Learning and Simplex Search for Distributed Flexible Assembly Permutation Flowshop Scheduling Problem
    Zhang, Guanghui
    Xing, Keyi
    Zhang, Guangyun
    He, Zhenxue
    IEEE ACCESS, 2020, 8 (08): : 96115 - 96128
  • [7] A self-learning knowledge-based MOEA/D for distributed heterogeneous assembly permutation flowshop scheduling with batch delivery
    Zhang, Zikai
    Tang, Qiuhua
    Wang, Ling
    Li, Zixiang
    Zhang, Liping
    KNOWLEDGE-BASED SYSTEMS, 2024, 284
  • [8] Scheduling the distributed assembly flowshop problem to minimize the makespan
    Ochi, Hanadi
    Driss, Olfa Belkahla
    CENTERIS2019--INTERNATIONAL CONFERENCE ON ENTERPRISE INFORMATION SYSTEMS/PROJMAN2019--INTERNATIONAL CONFERENCE ON PROJECT MANAGEMENT/HCIST2019--INTERNATIONAL CONFERENCE ON HEALTH AND SOCIAL CARE INFORMATION SYSTEMS AND TECHNOLOGIES, 2019, 164 : 471 - 477
  • [9] Effective constructive heuristics and meta-heuristics for the distributed assembly permutation flowshop scheduling problem
    Pan, Quan-Ke
    Gao, Liang
    Li Xin-Yu
    Jose, Framinan M.
    APPLIED SOFT COMPUTING, 2019, 81
  • [10] The distributed permutation flowshop scheduling problem
    Naderi, B.
    Ruiz, Ruben
    COMPUTERS & OPERATIONS RESEARCH, 2010, 37 (04) : 754 - 768