The distributed assembly permutation flowshop scheduling problem with flexible assembly and batch delivery

被引:64
|
作者
Yang, Shengluo [1 ,2 ,3 ]
Xu, Zhigang [1 ,2 ]
机构
[1] Chinese Acad Sci, Shenyang Inst Automat, Shenyang, Peoples R China
[2] Chinese Acad Sci, Inst Robot & Intelligent Mfg, Shenyang, Peoples R China
[3] Univ Chinese Acad Sci, Beijing, Peoples R China
关键词
scheduling; distributed assembly flowshop; variable neighbourhood descent; iterated greedy; batch delivery; flexible assembly; ITERATED GREEDY ALGORITHM; SUPPLY CHAIN; INTEGRATED PRODUCTION; MINIMIZING MAKESPAN; MULTIPLE CUSTOMERS; TOTAL FLOWTIME; SHOP; HEURISTICS; TARDINESS; TRANSPORTATION;
D O I
10.1080/00207543.2020.1757174
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The scheduling problems of distributed production have received increasing attention in recent years. To coordinate the scheduling of production and transportation, we propose a novel distributed assembly permutation flowshop scheduling problem with flexible assembly and batch delivery (DAPFSP-FABD). The objective is to minimise the total cost of delivery and tardiness. Given that the problem involves six successive decisions, several batch allocation strategies for both production and distribution are proposed, and four neighbourhood structures are designed to search for the best batch sequence, batch allocation, product sequence, and job sequence. Seven algorithms, including four heuristics, a variable neighbourhood descent (VND) algorithm, and two iterated greedy (IG) algorithms, are proposed. In the IG, two types of destruction and construction operations are present to facilitate escape from local optima, thereby resulting in two IG algorithms: IG_desP and IG_desJ. Finally, extensive computational and statistical experiments are carried out. The results show that the proposed batch allocation strategies can improve the solution significantly. Additionally, the heuristics can obtain reasonable solutions in a short time, while IG_desJ performs the best regarding the quality of solutions. This study can help cross-regional companies coordinate the scheduling of production and transportation and enhance the performance of supply chains.
引用
收藏
页码:4053 / 4071
页数:19
相关论文
共 50 条
  • [31] A referenced iterated greedy algorithm for the distributed assembly mixed no-idle permutation flowshop scheduling problem with the total tardiness criterion
    Li, Yuan-Zhen
    Pan, Quan-Ke
    Ruiz, Ruben
    Sang, Hong-Yan
    KNOWLEDGE-BASED SYSTEMS, 2022, 239
  • [32] A hybrid genetic algorithm for the distributed permutation flowshop scheduling problem
    Gao J.
    Chen R.
    International Journal of Computational Intelligence Systems, 2011, 4 (4) : 497 - 508
  • [33] A Two-Stage Invasive Weed Optimization Algorithm for Distributed Assembly Permutation Flowshop Problem
    Sang, Hong-yan
    Pan, Quang-ke
    Duan, Pei-yong
    Li, Jun-qing
    Duan, Peng
    2017 CHINESE AUTOMATION CONGRESS (CAC), 2017, : 7051 - 7056
  • [34] A biased-randomized simheuristic for the distributed assembly permutation flowshop problem with stochastic processing times
    Maria Gonzalez-Neira, Eliana
    Ferone, Daniele
    Hatami, Sara
    Juan, Angel A.
    SIMULATION MODELLING PRACTICE AND THEORY, 2017, 79 : 23 - 36
  • [35] Variable Neighborhood based Memetic Algorithm for Just-in-Time Distributed Assembly Permutation Flowshop Scheduling
    Wang, Keyao
    Li, Zhengyang
    Duan, Wenzhe
    Feng, Xiaoyi
    Liu, Bo
    2017 IEEE INTERNATIONAL CONFERENCE ON SYSTEMS, MAN, AND CYBERNETICS (SMC), 2017, : 3700 - 3704
  • [36] The three-stage assembly flowshop scheduling problem
    Koulamas, C
    Kyparisis, GJ
    COMPUTERS & OPERATIONS RESEARCH, 2001, 28 (07) : 689 - 704
  • [37] Variable Neighborhood based Memetic Algorithm for Distributed Assembly Permutation Flowshop
    Wang, Keyao
    Zhang, Ran
    Liu, Bo
    2016 IEEE CONGRESS ON EVOLUTIONARY COMPUTATION (CEC), 2016, : 1682 - 1686
  • [38] An Estimation of Distribution Algorithm-Based Hyper-Heuristic for the Distributed Assembly Mixed No-Idle Permutation Flowshop Scheduling Problem
    Zhao, Fuqing
    Zhu, Bo
    Wang, Ling
    IEEE TRANSACTIONS ON SYSTEMS MAN CYBERNETICS-SYSTEMS, 2023, 53 (09): : 5626 - 5637
  • [39] Distributed permutation flowshop scheduling problem with total completion time objective
    Ali, Arshad
    Gajpal, Yuvraj
    Elmekkawy, Tarek Y.
    OPSEARCH, 2021, 58 (02) : 425 - 447
  • [40] An efficient tabu search algorithm for the distributed permutation flowshop scheduling problem
    Gao, Jian
    Chen, Rong
    Deng, Wu
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2013, 51 (03) : 641 - 651