Heuristics for assembly operation scheduling problem in flexible assembly systems

被引:4
|
作者
Jeong, Bongju
Sim, Seung-Bae
Jung, Hosang [1 ]
机构
[1] Virginia Polytech Inst & State Univ, Grado Dept Ind & Syst Engn, Blacksburg, VA 24061 USA
[2] Yonsei Univ, Dept Informat & Ind Engn, Seodaemun Ku, Seoul 120749, South Korea
[3] Korea Inst Def Analyses, Ctr Def Informationalizat Studies, Seoul 130650, South Korea
关键词
assembly operation; flexible assembly systems; parallel processors scheduling problem;
D O I
10.1007/s00170-005-2605-1
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
In this paper we address the problem of scheduling n assembly operations with in-tree constraints on m unrelated parallel workstations in flexible assembly systems, which we call the assembly operation scheduling problem (AOSP). No preemption of assembly operations is allowed and the primary objective is to minimize the maximum completion time. This problem is equivalent to R vertical bar tree vertical bar C-max. For this notorious NP-hard problem, four heuristic algorithms including decomposition (DECOMP), earliest completion time (ECT), shortest processing time (SPT), and earliest starting time(EST) heuristic are proposed and their performances are comparatively investigated. DECOMP uses a decomposition technique to practically solve this problem. The assembly operation tree is decomposed and then AOSP is reduced to a set of subproblems of R vertical bar vertical bar C-max and R,r(j)vertical bar r(i)vertical bar C-max. Two efficient heuristics were proposed for the reduced subproblems. The other three heuristics basically use the machine selection rules to determine the machine for processing the current operation. Of these heuristics, DECOMP showed the best performance in terms of quality of schedule. Computational results show that all the proposed algorithms except the EST heuristic perform quite well in terms of both quality of solution and computation time.
引用
收藏
页码:1033 / 1040
页数:8
相关论文
共 50 条
  • [21] Heuristics to scenario-based capacity expansion problem of PWB assembly systems
    Hua, ZS
    Liang, L
    DATA MINING AND KNOWLEDGE MANAGEMENT, 2004, 3327 : 135 - 144
  • [22] Heuristics and metaheuristics for the distributed assembly permutation flowshop scheduling problem with sequence dependent setup times
    Hatami, Sara
    Ruiz, Ruben
    Andres-Romano, Carlos
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2015, 169 : 76 - 88
  • [23] MATHEMATICAL-MODELING OF A LOADING PROBLEM IN FLEXIBLE ASSEMBLY SYSTEMS
    LASHKARI, RS
    DUAN, M
    COMPUTERS & INDUSTRIAL ENGINEERING, 1994, 26 (02) : 243 - 251
  • [24] Modelling, simulation and scheduling of flexible assembly systems with coloured Petri nets
    Chetty, OVK
    Gnanasekaran, OC
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 1996, 11 (06): : 430 - 438
  • [25] DESIGN AND SCHEDULING OF FLEXIBLE ASSEMBLY SYSTEMS FOR LARGE PRODUCTS - A SIMULATION STUDY
    YANO, CA
    LEE, HF
    SRINIVASAN, MM
    JOURNAL OF MANUFACTURING SYSTEMS, 1991, 10 (01) : 54 - 66
  • [26] Modelling, simulation and scheduling of flexible assembly systems with coloured petri nets
    Indian Inst of Technology, Madras, India
    Int J Adv Manuf Technol, 6 (430-438):
  • [27] A mathematical model and extension algorithm for assembly flexible flow shop scheduling problem
    Fattahi, Parviz
    Hosseini, Seyed Mohammad Hassan
    Jolai, Fariborz
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2013, 65 (5-8): : 787 - 802
  • [28] A mathematical model and extension algorithm for assembly flexible flow shop scheduling problem
    Parviz Fattahi
    Seyed Mohammad Hassan Hosseini
    Fariborz Jolai
    The International Journal of Advanced Manufacturing Technology, 2013, 65 : 787 - 802
  • [29] MODULES IN FLEXIBLE ASSEMBLY SYSTEMS
    BINNIG, H
    WERKSTATTSTECHNIK ZEITSCHRIFT FUR INDUSTRIELLE FERTIGUNG, 1987, 77 (12): : 675 - 678
  • [30] AGGREGATE SCHEDULING OF A FLEXIBLE MACHINING AND ASSEMBLY SYSTEM
    KUSIAK, A
    IEEE TRANSACTIONS ON ROBOTICS AND AUTOMATION, 1989, 5 (04): : 451 - 459