Fuzzy project scheduling models under inflation condition

被引:2
|
作者
Wang, HF [1 ]
Fu, CC [1 ]
机构
[1] NATL TSING HUA UNIV,DEPT IND ENGN,HSINCHU 30043,TAIWAN
关键词
fuzzy set theory; project scheduling; inflation; NETWORK ANALYSIS; PERT;
D O I
10.1142/S0218488596000275
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
The paper defines four fuzzy project scheduling models under inflation condition without or with budget limit. The activity time is described by fuzzy relation or fuzzy variables. The models can be solved in the forms of crisp LP or NLP after using the concept of alpha-cut.
引用
收藏
页码:497 / 514
页数:18
相关论文
共 50 条
  • [31] Where do we stand with fuzzy project scheduling?
    Bonnal, P
    Gourc, D
    Lacoste, G
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2004, 130 (01): : 114 - 123
  • [32] A fuzzy time-dependent project scheduling problem
    Huang, Wei
    Oh, Sung-Kwun
    Pedrycz, Witold
    INFORMATION SCIENCES, 2013, 246 : 100 - 114
  • [33] Fuzzy Activity Starting Time Estimation for Project Scheduling
    Liu, Yu-Chuan
    PROCEEDINGS OF THE NINTH INTERNATIONAL CONFERENCE ON INFORMATION AND MANAGEMENT SCIENCES, 2010, 9 : 550 - 556
  • [34] Project scheduling problem with fuzzy activity duration times
    Ke, H
    Liu, BD
    2004 IEEE INTERNATIONAL CONFERENCE ON FUZZY SYSTEMS, VOLS 1-3, PROCEEDINGS, 2004, : 819 - 823
  • [35] Project Scheduling to Maximize Fuzzy Net Present Value
    Ucal, Irem
    Kuchta, Dorota
    WORLD CONGRESS ON ENGINEERING, WCE 2011, VOL II, 2011, : 1184 - 1189
  • [36] Minslack and Kangaroo Algorithms for Fuzzy Project Scheduling Problems
    Atli, Omer
    Kahraman, Cengiz
    JOURNAL OF MULTIPLE-VALUED LOGIC AND SOFT COMPUTING, 2013, 20 (1-2) : 189 - 219
  • [37] FUZZY PROJECT SCHEDULING SYSTEM FOR SOFTWARE-DEVELOPMENT
    HAPKE, M
    JASZKIEWICZ, A
    SLOWINSKI, R
    FUZZY SETS AND SYSTEMS, 1994, 67 (01) : 101 - 117
  • [38] Multi-Project Scheduling by Fuzzy Combinatorial Auction
    Cheng, Chi-Bin
    Lo, Chiao-Yu
    2017 3RD IEEE INTERNATIONAL CONFERENCE ON CYBERNETICS (CYBCONF), 2017, : 61 - 66
  • [39] A Bilevel Model for Project Scheduling in a Fuzzy Random Environment
    Xu, Jiuping
    Ma, Yanfang
    Xu, Zeshui
    IEEE TRANSACTIONS ON SYSTEMS MAN CYBERNETICS-SYSTEMS, 2015, 45 (10): : 1322 - 1335
  • [40] Applications of Fuzzy Critical Chain Method in Project Scheduling
    Zhao, Zhen-Yu
    You, Wei-Yang
    Lv, Qian-Lei
    ICNC 2008: FOURTH INTERNATIONAL CONFERENCE ON NATURAL COMPUTATION, VOL 6, PROCEEDINGS, 2008, : 473 - 477