Fuzzy project scheduling models under inflation condition

被引:2
|
作者
Wang, HF [1 ]
Fu, CC [1 ]
机构
[1] NATL TSING HUA UNIV,DEPT IND ENGN,HSINCHU 30043,TAIWAN
关键词
fuzzy set theory; project scheduling; inflation; NETWORK ANALYSIS; PERT;
D O I
10.1142/S0218488596000275
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
The paper defines four fuzzy project scheduling models under inflation condition without or with budget limit. The activity time is described by fuzzy relation or fuzzy variables. The models can be solved in the forms of crisp LP or NLP after using the concept of alpha-cut.
引用
收藏
页码:497 / 514
页数:18
相关论文
共 50 条
  • [21] Fuzzy finish time modeling for project scheduling
    Liu, Yu-chuan
    Yang, Shih-ming
    Lin, Yu-te
    JOURNAL OF ZHEJIANG UNIVERSITY-SCIENCE A, 2010, 11 (12): : 946 - 952
  • [22] FUZZY PROJECT SCHEDULING WITH DISCOUNTED CASH FLOWS
    Shavandi, Hassan
    Najafi, Amir Abbas
    Moslehirad, Alireza
    ECONOMIC COMPUTATION AND ECONOMIC CYBERNETICS STUDIES AND RESEARCH, 2012, 46 (01): : 219 - 232
  • [24] Fuzzy finish time modeling for project scheduling
    Yu-chuan Liu
    Shih-ming Yang
    Yu-te Lin
    Journal of Zhejiang University-SCIENCE A, 2010, 11 : 946 - 952
  • [25] A Heuristic Algorithm for Project Scheduling with Fuzzy Parameters
    Khalilzadeh, Mohammad
    Shakeni, Hedieh
    Gholami, Hadis
    Amini, Leila
    CENTERIS 2017 - INTERNATIONAL CONFERENCE ON ENTERPRISE INFORMATION SYSTEMS / PROJMAN 2017 - INTERNATIONAL CONFERENCE ON PROJECT MANAGEMENT / HCIST 2017 - INTERNATIONAL CONFERENCE ON HEALTH AND SOCIAL CARE INFORMATION SYSTEMS AND TECHNOLOGIES, CENTERI, 2017, 121 : 63 - 71
  • [26] Fuzzy finish time modeling for project scheduling
    Shih-ming YANG
    Journal of Zhejiang University-Science A(Applied Physics & Engineering), 2010, (12) : 946 - 952
  • [27] A New Fuzzy Estimation Algorithm for Project Scheduling
    Liu, Yu-Chuan
    EBM 2010: INTERNATIONAL CONFERENCE ON ENGINEERING AND BUSINESS MANAGEMENT, VOLS 1-8, 2010, : 2020 - 2023
  • [28] Fuzzy gain scheduling controllers based on fuzzy models
    Zhao, J
    Wertz, V
    Gorez, R
    FUZZ-IEEE '96 - PROCEEDINGS OF THE FIFTH IEEE INTERNATIONAL CONFERENCE ON FUZZY SYSTEMS, VOLS 1-3, 1996, : 1670 - 1676
  • [29] Process scheduling with fuzzy inference models
    Cardoso, Diego L.
    Santana, Adamo L.
    BROADBAND ACCESS COMMUNICATION TECHNOLOGIES II, 2007, 6776
  • [30] ON THE PROJECT SCHEDULING UNDER RESOURCE CONSTRAINTS
    Shih, Neng-Hui
    JOURNAL OF INDUSTRIAL AND PRODUCTION ENGINEERING, 2006, 23 (06) : 494 - 500