ON THE PROJECT SCHEDULING UNDER RESOURCE CONSTRAINTS

被引:0
|
作者
Shih, Neng-Hui [1 ]
机构
[1] Natl Pingtung Inst Commerce, Dept Business Adm, 51 Min Sheng E Rd, Pingtung, Taiwan
关键词
Project scheduling; resource constraint;
D O I
10.1080/10170660609509346
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper delves into the theoretic properties of the project scheduling problem that with stochastic durations and under resource constraints. This research begins with an exploration about how a resource conflict occurs and then uses a new definition of a strategy to solve the resource conflict. The strategy is decomposed into several tactics. Each tactic is associated with a solution of a resource conflict. Properties of the strategy are demonstrated. The relation between the preselective strategy and the proposed method is clarified. The dynamic properties of resource conflicts and the strategies are also discussed in this paper. Finally, this paper proposes a greedy method for the strategy of the resource allocation to reduce the completion time of the project.
引用
收藏
页码:494 / 500
页数:7
相关论文
共 50 条